My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GILLIS & ASSOCIATES 2
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
GILLIS & ASSOCIATES 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 12:46:29 PM
Creation date
9/8/2006 3:11:57 PM
Metadata
Fields
Template:
Contracts
Company Name
Gillis & Associates Architects, Inc
Contract #
A-2006-172
Agency
Public Works
Council Approval Date
7/3/2006
Insurance Exp Date
7/24/2012
Destruction Year
2019
Notes
Prof Liab exp 11/08/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Define project schedule dates. <br />4. Obtain documents and information from City Park Planning Staff as <br />outlined in "City Responsibilities" section. <br />C. PROGRAM ANALYSIS / DESIGN DEVELOPMENT <br />1. Assess and incorporate all design criteria - and construction <br />requirements as identified below. The following design requirements <br />shall conform to the City of Santa Ana and other governmental <br />agency requirements including, but not limited to handicapped <br />requirements, safety provisions, CBC, seismic considerations, <br />orientation, mechanical, electrical, maintenance factors, flood zone <br />requirements, fire and security codes: <br />• Santa Ana Municipal Code <br />• California Building Code (CBC) <br />• American's with Disabilities Act <br />• California Energy Code (Title 24, Part 6) <br />• California Mechanical Code (CIVIC) <br />• Appliance Standards, California Code of Regulations, Title 20 <br />• California Electrical Code (CEC) <br />• California Fire Code (CFC) <br />• National Fire Protection Association <br />• US Dept. of Agriculture <br />• California Plumbing Code <br />It will be the responsibility of the consultant to verify that it has <br />received the latest version or update of these documents. <br />survey. S <br />4. Assess space requirements of proposed facilities. <br />5. Assess pedestrian and service circulation patterns. <br />6. Assess project utility design requirements. Plot all known <br />underground utilities on base sheet within the general area in and <br />around the project site. Meet with City's Project Manager and City <br />Park Planner to review as -built drawings and to discuss known utility <br />runs and issues. Coordinate and resolve design and construction <br />phase conflicts between existing underground utilities and proposed <br />construction. <br />7. Assess all design criteria, standards, processing requirements and <br />C:1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.