My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GILLIS & ASSOCIATES 2
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
GILLIS & ASSOCIATES 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 12:46:29 PM
Creation date
9/8/2006 3:11:57 PM
Metadata
Fields
Template:
Contracts
Company Name
Gillis & Associates Architects, Inc
Contract #
A-2006-172
Agency
Public Works
Council Approval Date
7/3/2006
Insurance Exp Date
7/24/2012
Destruction Year
2019
Notes
Prof Liab exp 11/08/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction procedures from all governmental agencies having <br />jurisdiction. <br />8. Provide description of performance criteria and quality standards for <br />overall building systems such as structure, security, fire suppression, <br />lighting, HVAC, and energy, etc. <br />9. Prepare and present concept plan for Design Review Team approval. <br />D. CONTRACT DOCUMENTS <br />1. Contract Documents <br />Contract Documents shall be prepared based on the approved <br />concept plan. The contract documents shall include, but are not <br />limited to the following: <br />a. Drawings: <br />• Cover sheet <br />• Overall site plan, including parking lot <br />• Foundation plan with dimensions if necessary <br />• Floor plan with dimensions <br />• Schedules (including but not limited to finish, door, window, <br />hardware) <br />• Framing plan <br />• Building sections <br />• Interior elevations, as necessary <br />• Exterior elevations <br />• Roof plan <br />• Mechanical Plan <br />• Electrical/lighting plan (building) <br />• Plumbing plan <br />• "ADA", architectural, structural, electrical plumbing details <br />• T-24 documentation, as required by Building Department <br />• Structural Calculations <br />b. Project Special Provisions <br />c. Opinions of Probable Cost <br />2. SUBMITTALS <br />a. Submittals shall be delivered to the attention of the City at the <br />following address: <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.