My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GILLIS & ASSOCIATES 2
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
GILLIS & ASSOCIATES 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 12:46:29 PM
Creation date
9/8/2006 3:11:57 PM
Metadata
Fields
Template:
Contracts
Company Name
Gillis & Associates Architects, Inc
Contract #
A-2006-172
Agency
Public Works
Council Approval Date
7/3/2006
Insurance Exp Date
7/24/2012
Destruction Year
2019
Notes
Prof Liab exp 11/08/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Public Works Agency <br />20 Civic Center Plaza M36 <br />Santa Ana, CA 92702 <br />Attention: Souri Amirani <br />b. Submittal requirements : <br />60% PS&E (Unchecked Details) <br />(1) Unchecked plan details shall consist of 60% design and <br />detailed plans ready for the independent design check. <br />(2) The Consultant shall submit five (5) sets, of reduced <br />(11 "x17") prints of design plans, three (3) hard copies <br />and one (1) disk of draft SSP, two (2) copies of <br />preliminary quantities and estimates, two (2) copies of <br />pay item list. <br />2. 90% PS&E (Checked Details) <br />The Consultant shall submit the following documents for <br />review and approval: <br />Twelve sets (12) full size (24"x36") signed and sealed <br />prints of checked design <br />Twelve (12) copies of Special Provisions <br />One (1) copy of edited Special Provisions on a computer <br />disk <br />Three (3) copies of cost estimate and check quantity <br />calculations <br />Three (3) copies of design calculations <br />Other reports as needed by the City of Santa Ana <br />3. 100% PS&E <br />(1) The Consultant shall submit the following documents for <br />Building Department review and approval: <br />Three sets (3) full size (24"x36") signed and sealed <br />prints of checked design <br />Three (3) copies of Special Provisions <br />One (1) copy of edited Special Provisions on a computer <br />disk <br />Three (3) copies of cost estimate and check quantity <br />calculations <br />Three (3) copies of design calculations <br />Other reports as needed by the City of Santa Ana <br />(2) The City will review and comment on the PS&E package <br />as soon as possible. The turnaround goal is within four <br />(4) weeks of receipt of the complete PS&E package. <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.