My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
T (INACTIVE)
>
TRITECH SOFTWARE SYSTEMS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:41:48 PM
Creation date
10/9/2006 12:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS 2
Contract #
A-2006-256
Agency
FIRE
Council Approval Date
9/5/2006
Insurance Exp Date
5/1/2007
Destruction Year
2015
Notes
Amended by A-2006-256A, A-2008-331
Document Relationships
TRITECH SOFTWARE SYSTEMS 2a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
TRITECH SOFTWARE SYSTEMS 2b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A: Statement of Work <br />process. <br />C. Review the CAD and Mobile Functional System Description documents with the appropriate Santa <br />Ana personnel and document any changes and/or corrections that are mutually agreed upon in a <br />Change List. <br />d. Analyze, with Santa Ana personnel, the interface control document included as an exhibit to the <br />contract. <br />e. Submit the Change List to Santa Ana within thirty (30) business days of completion of the <br />Requirements Validation Session for each subsystem. <br />f. Address any deficiencies identified by Santa Ana in the Change List within ten (10) business days. <br />Exceptions to this term can be negotiated between the respective Project Managers at their <br />discretion. <br />Santa Ana shall: <br />a. Provide, upon request, currently existing information, data, records, and documents and make <br />such design decisions as are reasonably required to document changes necessary for the TriTech <br />applications. <br />b. Provide detailed specifications and definitions for all interfaces to non-TriTech systems. <br />C. Ensure that appropriate Santa Ana personnel are present and actively participating in scheduled <br />Requirements Validation meetings. <br />d. Review the Functional System Descriptions and Change List documents submitted by TriTech <br />and identify in writing any specific deficiencies found within twenty (20) business days. <br />e. Address any issues regarding Change List deficiencies raised by TriTech within ten (10) business <br />days. Exceptions to this term can be negotiated between the respective Project Managers at their <br />discretion. <br />Completion Criteria: <br />This task is considered complete when all issues related to tailoring and configuration have been resolved <br />in written agreement between Santa Ana and TriTech in a single document. Reported deficiencies must <br />have an accompanied scope and/or requirements document detailing the functionality found to be <br />deficient. <br />Task 2: TriTech Base Software Installation <br />Objective: Install and test all third party software, install base CAD application at SAFD facility. <br />Task Description: <br />During this phase, all applicable baseline CAD application software, as well as the vendor's operating <br />system software, necessary for this phase of the project to be completed, will be loaded on Santa Ana's <br />server equipment (located at SAFD facilities). TriTech reserves the right to decide what software may be <br />installed remotely. Santa Ana must provide adequate resource that will be onsite at Santa Ana when <br />remote installation tasks are executed. <br />Responsibilities: <br />TriTech shall: <br />a. Install the application software at SAFD <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.