My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
T (INACTIVE)
>
TRITECH SOFTWARE SYSTEMS 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 2:41:48 PM
Creation date
10/9/2006 12:09:16 PM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS 2
Contract #
A-2006-256
Agency
FIRE
Council Approval Date
9/5/2006
Insurance Exp Date
5/1/2007
Destruction Year
2015
Notes
Amended by A-2006-256A, A-2008-331
Document Relationships
TRITECH SOFTWARE SYSTEMS 2a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
TRITECH SOFTWARE SYSTEMS 2b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\T (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A: Statement of Work <br />TriTech will provide the Mobile software, to provide messaging via CAD/Mobile software, logging, syntax <br />translation (require definition and specification), and security capabilities for Mobile Data Computers <br />(MDCs), as outlined in the Functional System Description, including the interfaces defined in Exhibit B. <br />The software license will support site license mobile units. <br />Responsibilities: <br />TriTech shall: <br />a. Request record layouts and documents necessary to establish interfaces with all local and remote <br />systems and facilities immediately upon contract signature. <br />b. Install, tailor and unit test all software required for the mobile subsystem interfaces (defined in <br />Exhibit B) resulting in their operating in accordance with the Functional System Description, <br />Change List and Interface Control Documents. <br />Santa Ana shall: <br />a. Provide requested information on record layouts and documents necessary to establish interfaces <br />with all local and remote systems and facilities at least thirty (30) days prior to scheduled interface <br />work. <br />b. Provide and install all communications lines and equipment not provided by TriTech as <br />deliverables according to the contract documents. <br />C. Ensure that necessary certifications, approvals and other related issues will be completed by <br />Santa Ana at least thirty (30) calendar days prior to scheduled interface work. <br />d. Provide all required liaison support with the agencies and vendors required to support the <br />interfaces. <br />e. Ensure that the necessary technical support is made available for installation, testing and <br />demonstration of the interfaces. <br />Completion Criteria: <br />This task is considered complete when each interface is installed and unit tested. The operation or <br />availability of the external system or third -party software/hardware is necessary for task completion. <br />Task 7: Software Receipt and Installation <br />Objective: Install, configure and demonstrate software necessary for the operation of the TriTech's <br />mobile client. <br />Task Description: <br />During this phase, the message switch software will be installed and performance certification completed <br />on the system hardware. All applicable software, as well as equipment vendor's operating system <br />software, necessary for this phase of the project to be completed, will be loaded on Santa Ana's server <br />equipment. <br />Responsibilities: <br />TriTech shall: <br />a. Provide Santa Ana with an inventory list, including serial numbers, of all equipment delivered to <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.