My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DMJM HARRIS, INC 2 -2006
Clerk
>
Contracts / Agreements
>
D
>
DMJM HARRIS, INC 2 -2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2020 11:23:36 AM
Creation date
11/15/2006 1:23:16 PM
Metadata
Fields
Template:
Contracts
Company Name
DMJM HARRIS, INC
Contract #
A-2006-222
Agency
PUBLIC WORKS
Council Approval Date
8/21/2006
Insurance Exp Date
4/1/2013
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ <br />r <br />r <br />r <br />r <br />r <br />ao <br />~o <br />fi0 <br />50 <br />40 <br />30 <br />za <br />~o <br />0 <br /> <br />• Continue to provide project <br />management as generally defined <br />above <br />• Submit final PS&E documents to <br />the City and affected agencies for <br />final review and comment <br />• Incorporate final comments and <br />submit plans on original mylars <br />to the City for the purpose of <br />obtaining construction bids <br />• Provide electronic file of <br />construction drawings in <br />Microstation format <br />• Provide specifications in Microsoft <br />Word <br />Phase 3 -Construction <br />If requested by the City, our <br />construction management will <br />provide the following construction <br />services: <br />• Coordinate bid advertisement with <br />City staff <br />• Provide support during the bid <br />phase <br />• Prepare bid summary report and <br />selection recommendations <br />• Perform construction management <br />and administration <br />• Perform construction inspection <br />• Provide construction surveys and <br />grade sheet reviews <br />• Perform shop drawing review if <br />required <br />• Respond to Requests for <br />Information <br />• Coordinate materials and field <br />testing <br />• Prepare record drawings <br />Staff availability <br />Figure 2-3 shows graphically DMJM <br />Harris's present staff availability in <br />Figure 2-3. DMJM Harris's staff availability wil! <br />coincide nicely with the upcoming on-call projects <br />for the City. <br />City of Santa Ana On-Call Engineering and Landscaping Design Services - 2006 <br />civil and infrastructure engineering. <br />DMJM Harris has ample resources to <br />perform projects for the City of Santa <br />Ana. Our project team is prepared to <br />begin work immediately. <br />Management Plan <br />DMJM Harris's project <br />implementation is geared toward <br />quickly identifying and resolving <br />project issues and meeting <br />established goals. This process <br />features: <br />A. Project manager as single point of <br />contact <br />B. An effective communications <br />process <br />C. A comprehensive Quality Control <br />Plan ~ - <br />D. Project-specific scheduling and <br />project. controls <br />A. Project manager as single point <br />of contact <br />The DMJM Harris team's project <br />manager, Mr. Pat Somerville will <br />serve as our single point of contact <br />for the City of Santa Ana. In this <br />capacity he will be responsible for: <br />• Serving as primary contact with <br />the City and other agencies, as <br />required, to meet project needs <br />• Managing the DMJM Harris <br />team, including the authority to <br />make decisions on behalf of the <br />team and to commit corporate <br />resources to meet project <br />requirements <br />• Scheduling and internally <br />coordinating the team's work <br />• Ensuring that the project's <br />technical/professional and <br />contractual requirements are <br />thoroughly fulfilled <br />• Establishing clear lines of <br />communication both internally and <br />externally <br />• Chairing all regular project team <br />meetings and being the primary <br />respondent to the City <br />• Initiating and maintaining a quality <br />management program tailored to <br />the project <br />• Managing an effective project <br />controls system that delivers high <br />quality work on time and under <br />budget <br />1~ <br />t <br />B. An effective communications <br />process <br />The effectiveness of our <br />communication with the City of Santa <br />Ana and all project participants is <br />crucial to a successful project. Pat <br />Somerville is dedicated to fostering <br />a productive communication process <br />and to providing proactive design <br />issue resolution, working with the <br />City as an extension of staff. Figure <br />2-4 shows the tools used for effective <br />communications. <br />. F:ndIIFOe'llnmfer _ Aodrese Repons ~. <br />.;I~~~ N <br />w , <br />~n~a„tea n ~ ~, r:. <br />_-_..._- <br />~ - <br />,<:,~ _ - - <br />Figure 2-4. DMJM Harris uses an effective - <br />projectcommunications process to ensure a <br />successful project. <br />C. Project-specific Quality Control <br />Plan <br />Quality is essential on all engineering <br />projects. DMJM Harris is ISO <br />9001:2000 certified and employs a <br />quality management system (Figure <br />2-5). This program incorporates <br />quality review at each working level <br />from the project manager down and <br />from the discipline level up, and is <br />continually reinforced during the <br />project. There are four components <br />to this approach, as shown in Figure <br />2-6. They address all aspects of <br />the project and are performed <br />continually and at major milestones <br />during project development. They <br />include: <br />• Engineering discipline review. <br />During the project, prior to any <br />formal submittal, the design <br />and reports are reviewed by the <br />discipline managers. <br />S <br />~' DMJM HARRIS I AECOM <br />Jui Aug Sep Oct Nov Dec Jan Fetr Mer Apr May Jun <br />Zoos 200 <br />~~ Avalable sta1E based on projected warklaad <br />
The URL can be used to link to this page
Your browser does not support the video tag.