Laserfiche WebLink
JOPi ION ,9aa <br />e <br />�- l DMJM HARRIS AECOM <br />Bridge Structural Design Services <br />i V <br />• A complete copy of the Section 404 package will be <br />included. <br />• A complete copy of the Section 1602 notification will be <br />included. <br />• A copy of the final environmental document (CEQA) for <br />the project must be included, including the certification <br />of the final document. <br />• Other appropriate material as may be required by the <br />RWQCB. <br />• The filing fee is to be provided by the City. The RWQCB <br />bases its fees on a linear foot calculation or on acreage of <br />fill material to be deposited into jurisdictional waters. <br />Task 4.7: Section 1602 Notification of Lake or Streambed <br />Alteration. We will submit the following materials to the <br />CDFG: <br />• A standard CDFG Notification of Lake or Streambed <br />Alteration form. <br />• ACDFG Lake and Streambed Alteration Program project <br />questionnaire. <br />• A copy of the jurisdictional delineation report. <br />• A copy of the Section 404 package to the Corps. <br />• A copy of the preliminary mitigation and monitoring plan <br />as prepared for the 404 package with a provision to submit <br />the final plan upon its completion. <br />• A copy of the Section 401 application to the RWQCB. <br />• A copy of the final CEQA document for the project must <br />be included. <br />• Applicable plans, exhibits, and maps. <br />• The filing fee is to be provided by the City of Santa Ana. <br />This filing fee is based on the cost of the portion of the <br />project that requires a Streambed Alteration Agreement <br />(i.e., the portion of the project where the road crosses the <br />streambed). <br />Task 5 — Construction Support <br />5.1 Meetings - DMJM Harris will attend the pre-bid (if <br />applicable) and the preconstruction meeting for the project. <br />Additional meetings or site visits will be provided as required <br />(6 assumed). <br />5.2 Support Services - DMJM Harris will answer any <br />questions the City construction staff or contractor may <br />have on the contract drawings and specifications during <br />the bidding & construction phases of the project; provide <br />engineering assistance related to change order work; and <br />review shop drawings, submittals, and material certifications <br />for compliance with specifications. <br />5.3 As -Built Drawings - Upon completion of construction, <br />DMJM Harris will prepare as -built plans based upon the <br />red -line drawings provided by the City. <br />04601 324.5557 17 <br />