Laserfiche WebLink
assume that the Phase I provided will sufficiently address issues, and if it <br />does not, that the project applicant will provide subseQuent information. <br />Hydrology/Water Quality <br />To assess potential hydrology/water Quality impacts of the proposed <br />project, Fuscoe Engineering will prepare a water Quality study for the <br />project area and will review the hydrology study prepared by the <br />applicant for conformance with CEQA and stormwater reQuirements. <br />Fuscoe's scope of work includes attendance up to five meetings with the <br />City and/or project team. A technical water Quality report will be <br />prepared to be included as an appendix to the EIR- <br />► Hydrology Report Peer Review. Review the applicant's hydrology <br />report and verify existing and proposed runoff analysis in <br />conformance with the Orange County Hydrology Manual guidelines. <br />Prepare a Letter of Findings identifying any additional calculations, <br />clarifications and/or modifications to the hydrology report for CEQA <br />compliance. <br />► Water Quality Analysis. Review and summarize available water Quality <br />data (surface and ground water) for the local area; identify local <br />receiving water bodies, pollutants of concern based on land use <br />potential and local water Quality data and local regulatory concerns. <br />Evaluate the proposed project impacts on water Quality in <br />conformance with CEQA guidelines and the local NPDES County- <br />wide Storm Water Permit. Identify applicable site design, source <br />control and treatment control BMPs to be implemented into the <br />proposed project to satisfy water Quality reQuirements. Treatment <br />control BMPs will be sized according to the OC Drainage Area <br />Management Plan and City of Santa Ana sizing reQuirements. <br />Land Use and Planning <br />The proposed project increases the density from 7 dwelling units per <br />acre allowed in the General Plan to approximately 22 dwelling units per <br />acre. A general plan amendment to create a new mixed -use land use <br />designation is reQuired. A commercial/live work component is also <br />included as part of this project. <br />Past and present land use conditions will be documented, and the local <br />land use patterns will be described. Analysis of project impacts will focus <br />on project consistency with the goals and policies of the City's General <br />Plan and the proposed General Plan Amendment, Zone Change and <br />-Development Agreement. Specifically, The Planning Center will: <br />Page 2-10 Proposal to the City of Santa Ana <br />