My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PLANNING CENTER, THE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:02:27 PM
Creation date
3/21/2007 1:24:31 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2006-317
Agency
PLANNING & BUILDING
Council Approval Date
12/4/2006
Insurance Exp Date
7/1/2007
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Develop a noise impact mitigation plan for any predicted noise <br />impacts that exceed target noise exposure limits. <br />Population and Housing <br />Total residential population will be Quantified based on the proposed <br />amount and mix of residential densities, and compared with the <br />maximum allowable under the City's General Plan intensity tables to <br />determine whether the potential population would exceed the level of <br />growth included in adopted population projections used by the City and <br />regional planning agencies. The proposed mix of housing densities and <br />anticipated occupancies will be described and consistency with the City's <br />Housing Element will be evaluated. <br />Public Services <br />Public service agencies serving the proposed project will be contacted <br />to identify existing facilities that would be affected by the project, existing <br />service levels and capacities available to serve the proposed land uses, <br />and intensity of proposed development. The demand placed on these <br />services and utilities will be identified on the basis of standard planning <br />factors provided by each agency or from the City's General Plan, and the <br />ability of the agencies to accommodate this growth will be assessed. The <br />need for additional public facilities or personnel to serve the proposed <br />project and maintain adeQuate levels of service will be determined in <br />consultation with the agencies. Measures to avoid or reduce the <br />significance of project -related public service impacts will be developed <br />and included in the EIR. The public services to be addressed will <br />include: <br />• Fire Protection <br />• Police Protection <br />• Schools <br />• Public Library Services <br />Recreation <br />Demand for parkland and recreation facilities associated with the <br />potential population on -site will be estimated. Proposed parks, trails and <br />any other private or public recreational uses included in the proposed <br />project will be identified, and consistency with applicable parks, trails or <br />other recreation plans or programs will be assessed. Satisfaction of <br />parkland dedication reQuirements will also be discussed. Mitigation <br />measures will be developed for any significant impacts. <br />Proposal to the City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.