My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PLANNING CENTER, THE 2
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PLANNING CENTER, THE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 3:02:27 PM
Creation date
3/21/2007 1:24:31 PM
Metadata
Fields
Template:
Contracts
Company Name
PLANNING CENTER, THE
Contract #
A-2006-317
Agency
PLANNING & BUILDING
Council Approval Date
12/4/2006
Insurance Exp Date
7/1/2007
Destruction Year
2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analyses of up to three alternatives in addition to the "No Project" <br />Alternative are included in the cost estimate for the EIR. Potential <br />alternatives scenarios include ( I ) No-Project/Existing Conditions <br />Alternative: (2) Reduced Intensity Alternative 1; and, (3) Reduced <br />Intensity Alternative II and 4) an Alternative Land Use Plan Alternative. <br />Impacts associated with each alternative will be compared to proposed <br />project impacts, for each of the environmental impact categories <br />included in the preceding sections of the EIR. The environmentally <br />superior alternative will be identified; if it is the No-Project/Existing <br />Conditions Alternative, then one of the development alternatives will be <br />identified as environmentally superior to the others. <br />Task 4A CEQA-Mandated Sections <br />In addition to the topical issues discussed above, the following sections <br />will be prepared as mandated by CEQA: <br />Environmental effects found not to be significant during the Initial <br />Study Scoping process. <br />Adverse environmental impacts that cannot be avoided if the project <br />is implemented. This section will summarize those adverse project <br />impacts that cannot be mitigated to a level of less than significant. <br />Cumulative Impacts. A discussion of cumulative impacts will be <br />presented for each of the impact topics evaluated at length in the <br />preceding sections of the EIR. These discussions will be concise, <br />Quantified where appropriate, and will evaluate cumulative impacts <br />within an appropriate context for each issue. <br />Any irreversible environmental changes that will occur if the <br />proposed project is implemented. <br />• Growth -Inducing Impacts. This discussion will identify ways in which <br />the project could foster population or employment growth in this <br />area, either directly or indirectly. <br />Products: <br />Screencheck EIR plus technical appendices (5 review copies and <br />digital copy) <br />Page 2-14 Proposal to the City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.