My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KOA CORPORATION (KATZ, OKITSU & ASSOCIATES)
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
K-L (INACTIVE)
>
KOA CORPORATION (KATZ, OKITSU & ASSOCIATES)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:35:15 PM
Creation date
9/6/2007 10:04:08 AM
Metadata
Fields
Template:
Contracts
Company Name
KOA CORPORATION (KATZ, OKITSU & ASSOCIATES)
Contract #
A-2007-159
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
6/15/2008
Destruction Year
2014
Notes
Amended by A-2008-122
Document Relationships
KOA CORPORATION 1A
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\K-L (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />TO THE CITY OF SANTA ANA <br />FOR ENVIRONMENTAL CONSULTANTS -TRAFFIC <br />Submittal & Review of Report <br />Advance copies of the completed traffic study would be submitted to you for initial review. Upon your <br />approval, the study would then be submitted to the City as directed. Any proper or reasonable revisions <br />will be incorporated into the traffic study in order to be fully responsive to the Scope of Services. <br />Reasonable revisions include any corrections to the report within the general scope of work, but exclude <br />any traffic data collection or analysis at any locations except as specified in our proposal. <br />Project Support <br />KOA will furnish the following additional services: <br />Orr Estimates of project related traffic and daily traffic increases will be made available as soon as possible. <br />This will facilitate Air Quality and Noise Analysis. <br />4- We will assist as required to incorporate our report into the EIR. <br />+k We will assist in addressing any comments that relate to traffic and circulation issues, following <br />circulation of the screen check or the draft EIR. <br />4k KOA will be available to responsible parties to discuss traffic aspects of the project from our offices, as <br />needed throughout the project. <br />6 - General Fees &Time Schedule <br />The labor rates are based on the following billing rate summary and general provisions seen below: <br />CEO / President <br />$230/hour <br />Firm Principal / Vice President <br />$210/hour <br />Senior Transportation Engineer / Designer <br />$175/hour <br />Associate Engineer <br />$110/hour <br />Associate Designer / Planner <br />$105/hour <br />Assistant Transportation Engineer / Planner <br />$90/hour <br />Draftsman (ink) <br />$95/hour <br />Technician <br />$85/hour <br />Administrative Assistant <br />$65/hour <br />Messenger/Intern <br />$55/hour <br />GENERAL PROVISIONS <br />Telephone, equipment, and fax are normally included in above hourly costs. Direct expenses including <br />blacklining, commercial CAD plotting, subconsultant expense, issuance of specially endorsed insurance <br />Katz, Olatsu & Associates <br />Planning and Engineering 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.