My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RBF CONSULTING 1 - 2007
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2017
>
RBF CONSULTING 1 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2024 3:32:42 PM
Creation date
9/6/2007 1:11:34 PM
Metadata
Fields
Template:
Contracts
Company Name
RBF CONSULTING
Contract #
A-2007-165
Agency
PLANNING & BUILDING
Council Approval Date
6/18/2007
Expiration Date
6/30/2008
Insurance Exp Date
11/30/2008
Destruction Year
2017
Notes
Amended by A-2008-130, -001, -002, -003
Document Relationships
RBF CONSULTING 1A - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1B - 2009
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1C - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
RBF CONSULTING 1D - 2011
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rE <br />City of Santa Ana <br />E Proposal for 601 North Parkcenter Drive <br />Initial Study and Mitigated Negative Declaration <br />Localized Significance Thresholds. Consistent with the SCAQMD environmental <br />justice program and policies, localized air quality impacts on nearby sensitive <br />receptors (i.e., residences, schools, day-care centers, and hospitals) will be <br />evaluated. <br />Long -Term Emissions. RBF will quantify vehicular and area source emissions then <br />provide a comparison to the SCAQMD thresholds of significance. The emissions will <br />be quantitatively derived utilizing the EMFAC2007 and URBEMIS2007 models. <br />Project consistency with regional air quality plans, including the South Coast Air <br />Quality Management Plan, will be evaluated in the EIR section. RBF will address <br />cumulative air quality impacts based upon a list of cumulative projects supplied by <br />the City. RBF will also qualitatively address global warming issues as they pertain to <br />the global warming initiative (Assembly Bill 32), which was signed into law by <br />Governor Schwarzenegger on September 2006. <br />CO Hotspots. RBF staff will perform a screening -level analysis to verify exemption of <br />regional and local CO emissions utilizing the methodology prescribed by the UC <br />Davis Institute of Transportation Studies and the SCAQMD. <br />3.6 SHADE AND SHADOW <br />RBF will develop a massing model from electronic plans and elevations provided by <br />the Project applicant and prepare shade and shadow drawings for time intervals <br />throughout the day on the summer/winter solstices and vernal/autumnal equinoxes. <br />The analysis will reflect both existing and project buildout conditions. RBF will <br />prepare a written analysis of the shade and shadow affects, along with supporting <br />graphics addressing potentially significant impacts generated by the proposed <br />Project on the surrounding area. <br />4.0 CEQA INITIAL STUDY/ASSESSMENT <br />RBF will prepare an Initial Study in accordance with the CEQA Guidelines. The Initial Study <br />will include detailed explanations of all checklist determinations and discussions of potential <br />environmental impacts. The analysis shall be in accordance with Sections 15063, 15162, <br />15167 and 15168 of the CEQA statutes. The Initial Study report will be presented as follows: <br />4.1 INTRODUCTION <br />This section will cite the environmental review requirements of the Project, pursuant <br />to the CEQA Guidelines. The Introduction will include the Project location, <br />environmental setting, existing uses on -site and in the vicinity, the Project description <br />(confirmed by the City in Task 1.0), Project phasing, relevant background/history <br />information, and zoning considerations. <br />4.2 ENVIRONMENTAL CHECKLIST <br />�. This section will include a summary page of Project <br />explanation of factors considered for potential impacts <br />will be presented in a four column layout, identifyin <br />g: <br />information followed by an <br />The Initial Study Checklist <br />(1) potentially significant <br />JN 10-105908 <br />• 10 • <br />August 8, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.