Laserfiche WebLink
6 <br />OJGPTiON ���s The scoping meeting and PBS &J scheduling and management activities will serve as <br />A the basis for the development of the Project Work Program. This action plan will be <br />`} provided to all members of the PDT to ensure that all members clearly understand <br />their responsibilities and the timeliness of executing these responsibilities. <br />Task 2: Data Collection <br />Obtain & Review Existing Roadway Plans, Reports and Studies <br />A review of the City's General Plan and Orange County Master Plan of Arterial High- <br />ways (MPAH) will commence during this milestone. <br />Surveys Services <br />The field surveyors will recover existing survey control and key record centerline <br />monuments within the roadway alignment for EB MacArthur under the bridge and <br />the on- ramps. In addition, the surveyors will locate all surface - visible utility features <br />and verify elevations /vertical clearances for the existing bridge structure (SR- 55 /Ma- <br />cArthur). The project surveyor will plot existing right of way limits using existing <br />record information from Caltrans, District 12 and County of Orange. <br />Aerial Mapping <br />Our subconsultant, Towill, will compile design level mapping for the subject at a scale <br />of 50:1 with 1 foot contour interval. The area of coverage will be from Hutton Center <br />Drive on the west to Fitch on the east and the strip of land centered along MacArthur <br />extending 150' north and south of intersection with SR -55. <br />Geotechnical Evaluation <br />Our scope of work for PSR/PR preparation will consist of preliminary geotechnical <br />study and Environmental Initial Site Assessment (ISA) in general accordance with the <br />current ASTM "Standard Practice for Environmental Site Assessments: Phase I En- <br />vironmental Site Assessments Process 1527 -05" and California State Department of <br />Transportation, Project Development Procedures Manual, dated July 1, 1999. <br />Structures As- builts and Data <br />PBS &J will compile all existing records pertaining to the existing structures such as <br />as -built plans, maintenance reports, construction records, and utility maps. We already <br />have obtained the plans of the existing undercrossing structure to investigate the <br />available width from the existing face of columns on median to the side columns. We <br />anticipate no structural modification will be required for this project. <br />Traffic Data <br />Our traffic subconsultant, Urban Crossroads will be responsible for performing the <br />traffic engineering related services for this project. This will include obtaining existing <br />traffic data, working with the City of Santa Ana to obtain forecasted traffic data, and <br />analyzing the level of service (LOS) of the traffic operations at the project site for exist- <br />ing conditions and design -year forecasted conditions. In addition, Urban Crossroads <br />will develop the traffic- related sections in the PSR/PR and environmental docu- <br />ment. Existing traffic and accident data will be collected and evaluated from City and <br />Caltrans. <br />IT' C11 es_itl ',Nwrs I(Iof 1 r P <br />. �:� �:; PBS &J... We Make it Happen <br />