Laserfiche WebLink
N <br />N <br />JGP ?ioN FAR • Obtain Existing Traffic Data- In order to document and evaluate the current traffic <br />operations on MacArthur /SR -55 Undercrossing, we propose to obtain traffic counts, <br />1 along with vehicle classification data, utilizing tube counters. Traffic utilizing MacAr- <br />thur in each direction of travel would be counted on a 24 -hour basis for one week. <br />' �. • In addition to obtaining the traffic count data indicated above, we would request <br />ATMS traffic data for the mainline SR -55 in the project area from Caltrans District 12. <br />Furthermore, Urban Crossroads will work with Caltrans District 12 and the City of <br />Santa Ana to obtain relevant traffic accident data in the project area. <br />Task 3: Initial Engineering Studies <br />• Develop alternatives (Plan, profiles, super elevations - TYP plans) <br />• Preliminary grading and drainage impact study (hydraulics /hydrology studies) <br />• Mandatory and advisory fact sheet <br />• Traffic analysis and construction staging and TMP <br />• Utility plans <br />• Preliminary geotechnical report <br />• Preliminary cost estimate <br />• Stormwarer data report <br />• Submit plans to agencies for informal review <br />Develop Alternatives (Plan, Profile, Typical Sections) <br />Plan. PBS &J will investigate the concepts that will be compatible with the "Mini- <br />mum Project Alternative" and "Stage Able Alternative" per Caltrans Project Develop- <br />ment Guidelines, Caltrans Highway Design Manual, and City of Santa Ana Standard <br />Plan. These initial layouts will be evaluated to determine which concepts accomplish <br />the goals defined by PDT in the scoping meeting. Two alternatives will be selected <br />and presented to the PDT. The alternatives will be prepared with 50:1 scale to provide <br />better accuracy. <br />Profiles. Horizontal and vertical profiles of the MacArthur Blvd. and all other inter- <br />secting streets and access roads will be carefully analyzed to evaluate impact of the <br />outside widening. <br />Typical Cross Sections. Typical cross sections will be developed based on the recom- <br />mendation of the traffic analysis for number of traffic lanes required. <br />Grading. Cut /fill slopes will be generated for establishing right of way requirements. <br />Grading Plans will be prepared utilizing the Microstation and Inroads to identify the <br />new toe of slopes. <br />All design plans will be in English unit per Caltrans guidelines. <br />Construction Staging Plan. Traffic handling concepts will be developed for each <br />alternative to determine impact to local traffic circulation and cons tructabili ty. <br />Construction Estimate. It will be prepared for each selected alternative per Caltrans <br />guidelines for PSR/PR. <br />Advance Planning Study. Assumed, at this time, not to be required. <br />Retaining Walls. Assumed, at this time, not to be required. <br />e. �c:x• ;, -, . .- r PBS &J... We Make it Happen! PM] <br />