My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PBS&J 2 - 2007
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2020
>
PBS&J 2 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2016 1:11:56 PM
Creation date
9/12/2007 9:15:09 AM
Metadata
Fields
Template:
Contracts
Company Name
PBS&J
Contract #
A-2007-185
Agency
PUBLIC WORKS
Council Approval Date
8/6/2007
Insurance Exp Date
4/1/2013
Destruction Year
2020
Notes
Amended by A-2007-185, A-2010-005
Document Relationships
PBS&J 2A - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
PBS&J 2B - 2010
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i- <br />11 <br />�OJGPT PHASE 2.0 — PS &E PREPARATION <br />(30%,60%,95%, AND 100 % SUBMITTAL) <br />y <br />'Ibis section outlines our anticipated scope of work for the "Final Design" phase of this <br />project. Upon completion and approval of the PSR/PR Report, our team will begin <br />the PS &E phase. <br />� T89910tli Ili n7!h; <br />Task 7 - 30% Roadway Plans - Layouts, Typical Sec- <br />tions & Profiles <br />No exceptions taken. <br />Task 8- 60% Design Plans <br />No exceptions taken. <br />Construction Cost Estimates <br />No exceptions taken. <br />Supplemental Special Provisions (SSP) <br />We understand the City is the Lead Agency, and for the purposes of this proposal we <br />assume the City will administer the construction contract. As such, the City will pro- <br />vide the boilerplate contract documents to be included in the specifications package. <br />We will prepare the technical. We propose to use Caltrans standard specifications and <br />method for all special provisions required within Caltrans jurisdictions. <br />Our scope of work for PS &E preparation will consist of geotechnical exploration to <br />develop recommendations for design and construction of the project and environmen- <br />tal site investigation for aerially deposited lead (ADL). <br />Geotechnical Exploration. Additional geotechnical including borings will be re- <br />quired for the final design phase and will be performed per the RFP scope. <br />Aerially Deposited Lead. Based on Leighton Consulting's experience, aerially depos- <br />ited lead (ADL) will be an issue identified in the ISA. Therefore, the following scope <br />was prepared to assess the presence or absence of ADL. The work is being conducted <br />to assess to what extent lead - impacted soil may be present to determine the appropri- <br />ate disposition of soils that will be disturbed during construction of the project. <br />Task 9 90% Design Plans <br />No exception is taken. <br />Stormwater Data Report <br />No exception is taken. <br />Stage Constructions, Traffic Handling, and TMP <br />Final stage construction and traffic handling plans will result from the early study of <br />alternative staging concepts with concurrence from the agencies and property owners <br />PBS &J... We Make it Happenl <br />
The URL can be used to link to this page
Your browser does not support the video tag.