i- <br />11 <br />�OJGPT PHASE 2.0 — PS &E PREPARATION <br />(30%,60%,95%, AND 100 % SUBMITTAL) <br />y <br />'Ibis section outlines our anticipated scope of work for the "Final Design" phase of this <br />project. Upon completion and approval of the PSR/PR Report, our team will begin <br />the PS &E phase. <br />� T89910tli Ili n7!h; <br />Task 7 - 30% Roadway Plans - Layouts, Typical Sec- <br />tions & Profiles <br />No exceptions taken. <br />Task 8- 60% Design Plans <br />No exceptions taken. <br />Construction Cost Estimates <br />No exceptions taken. <br />Supplemental Special Provisions (SSP) <br />We understand the City is the Lead Agency, and for the purposes of this proposal we <br />assume the City will administer the construction contract. As such, the City will pro- <br />vide the boilerplate contract documents to be included in the specifications package. <br />We will prepare the technical. We propose to use Caltrans standard specifications and <br />method for all special provisions required within Caltrans jurisdictions. <br />Our scope of work for PS &E preparation will consist of geotechnical exploration to <br />develop recommendations for design and construction of the project and environmen- <br />tal site investigation for aerially deposited lead (ADL). <br />Geotechnical Exploration. Additional geotechnical including borings will be re- <br />quired for the final design phase and will be performed per the RFP scope. <br />Aerially Deposited Lead. Based on Leighton Consulting's experience, aerially depos- <br />ited lead (ADL) will be an issue identified in the ISA. Therefore, the following scope <br />was prepared to assess the presence or absence of ADL. The work is being conducted <br />to assess to what extent lead - impacted soil may be present to determine the appropri- <br />ate disposition of soils that will be disturbed during construction of the project. <br />Task 9 90% Design Plans <br />No exception is taken. <br />Stormwater Data Report <br />No exception is taken. <br />Stage Constructions, Traffic Handling, and TMP <br />Final stage construction and traffic handling plans will result from the early study of <br />alternative staging concepts with concurrence from the agencies and property owners <br />PBS &J... We Make it Happenl <br />