Laserfiche WebLink
<br />III~'I'III"'II '11")11"'"''11' I IIIf 1'111"1'" "III" II 'FIr , "IIJnlTlnl'IIIIWll~I'~II~~l'I~'fllln'lll"lll'T1I'1I'IIIIIIIII' <br /> <br />F ~~~~~~~~ <br /> <br /> <br />PHASE 05 - Staging and Shipping <br /> <br />1. Receive / Review Client Entered Data <br />2. Verify All installed Hardware and Positron Software. and third party software complies with <br />Positron's specifications <br />3. Verify Software Readiness /Configuration and Test <br />4. Verify CLETs Interface Configuration <br />5. Confirm Readiness of Interfaces <br /> <br />Objective: <br /> <br />Develop, install and test all I QjCAD Subsystem Interfaces. <br /> <br />Task Description: <br /> <br />Once the software has been installed on Santa Ana's premises on Santa Ana provided <br />equipment, all remaining local and remote interfaces as specified in the list of deliverables in the <br />contract documents will be developed, installed and tested. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Design, develop, transfer, install, tailor and unit test all software required for the <br />following IQjCAD subsystem interfaces resulting in their operating in accordance with <br />the Technical description documentation, Change List and Interface Control Documents: <br /> <br />. CAD - Existing 911 System. <br />. IQjCAD - Police RMS (bi-directional) <br />. IQjCAD - CLETS/Orange County/NCIC/NLETS (bidirectional) via ComSys <br />. IQjCAD - Positron IQjMobile Software [(Positron IQ Mobile client, RMS client), <br />(bidirectional)] <br /> <br />b. <br /> <br />Identify all required information on record layouts and documents necessary to <br />establish interfaces with local and remote systems and facilities twenty one (21) days <br />prior to installation. Santa Ana has made every effort to include interface specification <br />requirements will be detailed in the attached interface control document hereto <br />attached as Attachment A-3. However, Positron is responsible for identifying and <br />requesting all information necessary to successfully install and test every interface <br />identified within this task and the Interface Control Document twenty one (21) days <br />prior to installation. <br /> <br />r <br />~ <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQ/CAD System Statement of Work <br /> <br />Page 26 of 149 <br /> <br />I <br /> <br />r <br />