My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON 1B -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON 1B -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:29:26 AM
Creation date
2/26/2008 11:25:27 AM
Metadata
Fields
Template:
Contracts
Company Name
POSITRON
Contract #
A-2004-229-002
Agency
POLICE
Insurance Exp Date
12/31/2008
Destruction Year
0
Notes
A-2004-229; PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1/1111'1111 'I '11111 'I'! 11'11!'r' '!" I" , <br /> <br />p ~~~~~~~~ <br /> <br /> <br />d, Assist the training staff in utilizing the subsystem and the computer operations staff in <br />supporting the subsystem. <br /> <br />Santa Ana shall: <br /> <br />a. Place the software into production within five (5) calendar days following certification <br />and begin operational use in consultation with Positron and in accordance with the <br />Project Schedule. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when IQjCAD is placed into production operation. <br /> <br />6.Cutover Complete <br />7.Cutover Support For Reliability Testing <br /> <br />Objective: <br /> <br />Verify the level of reliability of IQjCAD in a production environment. <br /> <br />Task Description: <br /> <br />Verify that the IQjCAD subsystem demonstrates reliable operation in a production environment <br />prior to the start of the application software warranty period. <br /> <br />IQjCAD will demonstrate critical subsystem availability levels of 99.9% or better for a thirty (30) <br />calendar day Reliability Testing period. <br /> <br />At the end of this test period, if subsystem availability has not met or exceeded this required <br />level, the Reliability Testing period will continue until this level of reliability has been <br />demonstrated for at least thirty (30) consecutive calendar days. <br /> <br />The IQjCAD subsystem will be considered "down" if there is a failure of any IQjCAD redundant <br />software module or component that prevents critical event entry, dispatch or status monitoring <br />functions to operate at a level that allows operation to continue. Functional problems that do <br />not prevent productive use of the subsystem are not considered downtime. Software problems <br />of this type are documented by Santa Ana on an "action item list" to be fixed during this phase. <br />Downtime will begin at the time that the designated Positron contact person has been notified <br />of the failure. <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 33 of 149 <br /> <br />~~ <br /> <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.