Laserfiche WebLink
<br />'1Im~1I11~I[I'lm""'I\r lIl~rlll'p' JrI"'ll' 1JI11']I'1fl11 ~1I111rll1' 11'\ liT 111',],~1~IIl!l'~rll'1Ir11[r IIIW' WIT1 ' I <br /> <br />p ~~~~~~~~ <br /> <br /> <br />The subsystem shall not be considered down during any manual or automated fail-over process, <br />or if it is operational in a backup mode or via replacement with spares, pending the receipt of <br />replacement components and repair of the failed component. <br /> <br />Failures in individual communication lines, terminals, workstations, PCs, non-Positron PC <br />licensed software, modems, data communications or problems that involve non-redundant or <br />fault-tolerant hardware or remote workstation or terminal sites do not constitute downtime. <br />They will be repaired as expediently as possible, and operations will then continue. <br /> <br />IQjCAD Reliability Testing will not be delayed or interrupted if there are failures in systems that <br />are not the responsibility of Positron (communication lines, external databases, etc.). Also, the <br />reliability test and subsystem certification will not be delayed if any user-provided peripheral <br />components encounter a failure or have not been made available for implementation and <br />testing according to the project schedule. Scheduled subsystem unavailability for purposes of <br />software update, performance tuning, file backups and other processes typical in a production <br />environment is not considered as downtime. <br /> <br />In the event that the subsystem is considered to be "down" during this test period, one of the <br />following will occur: <br /> <br />Subsystem operation will be suspended, the problem is considered "major," and <br />immediately diagnosed and corrected. After installation of the appropriate <br />corrections, the test period will resume, logging the time since Positron was notified <br />of the failure as downtime, or <br /> <br />Subsystem operation will continue, the problem will be logged and then corrected, <br />tested and demonstrated during the reliability test period. In this case, the problem <br />is documented as a "minor" system problem, the subsystem not removed from on- <br />line operation, and the subsystem is not considered down. <br /> <br />No software, related subsystem changes or enhancements shall be made to any subsystem <br />undergoing subsystem certification unless they are directly related to addressing a "major" <br />failure. <br /> <br />The Reliability Testing process can be temporarily suspended upon agreement between Santa <br />Ana and Positron for scheduled changes, software corrections or upgrades. In this event, the <br />test period will resume when the subsystem is again operational, without logging downtime. <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 34 of 149 <br /> <br />~~ <br /> <br />- <br />