My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON 1B -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON 1B -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:29:26 AM
Creation date
2/26/2008 11:25:27 AM
Metadata
Fields
Template:
Contracts
Company Name
POSITRON
Contract #
A-2004-229-002
Agency
POLICE
Insurance Exp Date
12/31/2008
Destruction Year
0
Notes
A-2004-229; PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1'PI~~I' 11"11rI1II1I'111III' 'II r I" '11"11'1' <br /> <br />p ~~~~~~~~ <br /> <br /> <br />d, Contact Positron personnel in a timely manner in the event of subsystem problems or <br />failures. <br /> <br />e, Begin subsystem monitoring in support of the warranty period. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete after IQjCAD has demonstrated critical system availability <br />levels during the test period of 99.9% or better for a thirty (30) day Subsystem Reliability Test <br />period, commencing at the completion of IQjCAD Production Cutover. <br /> <br />8.Total System Validation & Acceptance <br /> <br />Objective: <br /> <br />Perform functional tests of Positron IQjMobile applications. <br /> <br />Task Description: <br /> <br />Demonstrate the applicable functions and features of the IQjMMobile functionality, as per the <br />Project Schedule as defined in the Positron specification documents, Santa Ana's configuration <br />requirements, including Attachment A-6, and the Positron Acceptance Test Plan. Santa Ana staff <br />will perform functional testing of the Positron subsystem. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Utilize the Positron specification documents, Santa Ana's configuration requirements, <br />Attachment A-6 and the Positron Acceptance Test Plan as a guideline for all functional <br />tests. <br /> <br />b. Certify all applicable software, subsystems and ancillary systems as ready for functional <br />testing. <br /> <br />c. Demonstrate the tailored and configured functions ofthe installed subsystem. <br /> <br />d. Review any discrepancies in functionality identified by Santa Ana. Software or <br />documentation shall be corrected prior to Positron Final Certification as needed to <br />correct the discrepancies as identified. <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQlCAD System Statement of Work <br /> <br />Page 36 of 149 <br /> <br />~ <br /> <br />, <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.