My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
POSITRON 1B -2004
Clerk
>
Contracts / Agreements
>
P
>
POSITRON 1B -2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2013 11:29:26 AM
Creation date
2/26/2008 11:25:27 AM
Metadata
Fields
Template:
Contracts
Company Name
POSITRON
Contract #
A-2004-229-002
Agency
POLICE
Insurance Exp Date
12/31/2008
Destruction Year
0
Notes
A-2004-229; PER LAURA SHEEDY IPC IS FOR POSITRON. SHE WILL REQUEST LETTER FOR FILE AFFIRMING THIS.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />IIW"llrlI1rrlll11ll1nllll~ 1)1 III' 1'1"11 !~~llrrll' I" I ''II <br /> <br />P ~~~~!~~~ <br /> <br /> <br />Santa Ana shall: <br /> <br />a. Generate test data files needed for functional testing. <br /> <br />b. Verify each function identified in the Positron specification documents, Santa Ana's <br />configuration requirements, Attachment A-6 and the Positron Acceptance Test Plan to <br />its operation as documented. <br /> <br />c. Document each discrepancy of functionality located between tested criteria and the <br />Positron specification documents, Santa Ana's configuration requirements, Attachment <br />A-6 and the Positron Acceptance Test Plan. <br /> <br />d. Work with Positron to identify the type of correction needed to ensure that each <br />subsystem conforms to the Positron specification documents, Santa Ana's configuration <br />requirements, Attachment A-6 and the Positron Acceptance Test Plan. <br /> <br />Completion Criteria: <br /> <br />This task is considered complete when Positron's IQjMobile system has been demonstrated to <br />operate in accordance with the Positron specification documents, Santa Ana's configuration <br />requirements, Attachment A-6 and the Positron Acceptance Test Plan on six (6) Santa Ana- <br />supplied MDCs (the installation of the mobile software on the remaining Santa Ana-supplied <br />MDCs is not required for task completion). <br /> <br />Objective: <br /> <br />Perform functional tests of IQjCAD. <br /> <br />Task Description: <br /> <br />Demonstrate the applicable functions and features of IQjCAD as defined in the IQjCAD <br />Technical Specification Documents as per the Project Schedule. Santa Ana staff will perform <br />functional testing of the IQjCAD subsystem. <br /> <br />Responsibilities: <br /> <br />Positron shall: <br /> <br />a. Utilize the Updated IQjCAD Positron RFP response and the system acceptance test plan <br />as a guideline for all I QjCAD functional testing. <br /> <br />CHANGE ORDER #2 to Computer Aided Dispatch Purchase Agreement A-2004-229 <br />Exhibit A.1 - IQ/CAD System Statement of Work <br /> <br />Page 37 of 149 <br /> <br />\0 <br />~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.