Laserfiche WebLink
November 27, 2007 <br />Page 4 <br />City of Santa Ana <br />enclosures on the adjacent parcels. For instance, Starbucks and all of the other retailers <br />located on the corner of Bristol & Memory Lane utilize a loading zone located within <br />Floral Park Promenade. This can be seen on the attached Exhibit A and was approved <br />within the last few years by city staff, suggesting that this issue has not stopped <br />development. <br />Landscape Buffer Adjacent to Residential PropertX <br />As discussed earlier, the northern boundary of the property as shown in the staff report <br />includes a portion ofground-leased property from the adjacent residential property <br />(Village Green) and will never meet this requirement. As part of the negotiations with <br />Village Green, we do have a proposal that will allow for the swap of the existing parking <br />area (currently under a ground lease) to be located within the boundary of the proposed <br />lot. This would allow for a driveway relocation that would provide more of a buffer from <br />the residential property. <br />Subdividing Integrated Shopping Centers <br />This issue has been discussed relative to all of the sections noted above and with proper <br />documentation, long term control can be instituted. Furthermore, staff has, in the past, <br />supported the use of the proposed documentation to assist in long term consistency <br />regardless of fractured ownership. It should further be noted that this city's staff has <br />consistently required Red Mountain Retail Group, as a partial owners of other <br />integrated /fractured shopping centers, to re-develop sites as if they are the owner <br />of the entire site relying on code sections that require these re-developments to be <br />integrated. <br />For example, the development of the last phase of Home Place Plaza (Osh Hardware on <br />E. 17`" Street, North of Tustin) was approved earlier this year. As part of the approval, <br />and with existing fractured ownership, Red Mountain was required as part of its <br />conditions, to include paint and architectural enhancements on buildings that were not <br />owned by Red Mountain in order to provide for consistency throughout the "integrated <br />shopping center" and this was based on specific code requirements cited by city staff <br />member Ann Ni.2 <br />General Plan Consistency <br />In reviewing the staff report, there was a reliance on the General Plan and the <br />inconsistency of this application. After reviewing the General Plan, we offer the <br />following sections that show this application is consistent with the following policies. <br />z The approval required upgrading the paint and materials of the existing (old gateway building and Osh <br />Hardware) buildings to match the proposed mixed use commercial building that is currently being <br />constructed. <br />1234 East Seventeenth Street, Santa Ana, CA 92701 <br />32A-16 <br />