My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2 - 2008
Clerk
>
Contracts / Agreements
>
I
>
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 10:18:01 AM
Creation date
3/5/2008 9:54:40 AM
Metadata
Fields
Template:
Contracts
Company Name
INFOR (US) INC. (FORMERLY Lawson Software Americas, Inc.)
Contract #
A-2008-037
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
3/3/2008
Insurance Exp Date
11/1/2009
Destruction Year
0
Notes
NAME CHANGE AS OF 7/1/12 SEE LETTER AUTO & WORKER'S COMP EXP 11/1/09
Document Relationships
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2A
(Amended By)
Path:
\Contracts / Agreements\I
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2B
(Amended By)
Path:
\Contracts / Agreements\I
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2C
(Amended By)
Path:
\Contracts / Agreements\I
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2D -2010
(Amended By)
Path:
\Contracts / Agreements\I
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2E -2008
(Amended By)
Path:
\Contracts / Agreements\I
INFOR (US) INC. (FORMERLY LAWSON SOFTWARE) 2F
(Amended By)
Path:
\Contracts / Agreements\I
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
511
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAWSN <br />Deliverable Acceptance Criteria <br />Criteria <br />Details <br />Project PIanNVritten <br />. The requirements of the Deliverable are met as stated in the completion <br />Deliverables <br />criteria of the Statement of Work <br />• The Deliverable complies with the Lawson format using the Lawson <br />standard templates <br />• The Deliverable is consistent with other Deliverables already approved <br />• The Deliverable meets the general review criteria (e.g., pages numbered, <br />free of formatting and spelling errors, clearly written, no incomplete <br />sections, etc.) <br />• Procedures /documentation Deliverables comply with the technical /business <br />system design <br />Technical Deliverables <br />• The technical design and all Deliverables are in compliance with the <br />Business System Design and pass all related tests in the test plans <br />• All documented tools (Process Flows, Smart Notification) meet the technical <br />design specifications, and work in accordance with the Documentation. <br />• All documented reports meet the technical design specifications, are <br />complete and are free of material errors <br />• All documented modifications complete the expected function and return an <br />error free statement <br />• All documented personalizations (Design Studio) complete the expected <br />function and return an error free statement <br />• All converted data is free of material errors and balances in the application <br />system. <br />• All open transactions load error free in the application system. <br />• All interfaces load error free (and balance) in the application system. <br />TrainingNVorkshop <br />. Participant surveys are completed and returned by class/workshop <br />Deliverables <br />participants <br />• A follow up plan is completed and approved based upon participant <br />feedback <br />Installation Deliverables <br />• Completed successful installation test and exit document <br />Testing Deliverables <br />Unit (Conference Room Pilot) and System Tests have been executed per the <br />CRP and System Test Plan and in compliance with the Business System Design <br />• Integration testing during the System Test have been executed per the System <br />Test Plan and in compliance with the Business System Design <br />Technical/ Business System <br />0 Design document complete with businesstlechnical requirements addressed <br />Design Deliverables <br />based upon the Functional Requirements Matrix documented in this Appendix C. <br />Configuration /Design <br />System configuration is complete per the Design Document <br />Deliverables <br />SOW- SantaAna- 12Feb08 vFinal_v2.doc Confidential 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.