My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BELL BUILDING MAINTENANCE COMPANY 1 - 2008
Clerk
>
Contracts / Agreements
>
_PENDING FOLDER
>
READY TO DESTROY IN 2019
>
BELL BUILDING MAINTENANCE COMPANY 1 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2015 3:34:23 PM
Creation date
5/27/2008 3:35:03 PM
Metadata
Fields
Template:
Contracts
Company Name
BELL BUILDING MAINTENANCE COMPANY
Contract #
A-2008-093
Agency
Parks, Recreation, & Community Services
Council Approval Date
5/5/2008
Expiration Date
5/22/2010
Insurance Exp Date
1/10/2010
Destruction Year
2019
Notes
Amended by A-2008-093-01, A-2012-094
Document Relationships
BELL BUILDING MAINTENANCE COMPANY 1A - 2008
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
BELL BUILDING MAINTENANCE COMPANY 1B - 2012
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
BELL BUILDING MAINTENANCE COMPANY 1C - 2014
(Amended By)
Path:
\Contracts / Agreements\_PENDING FOLDER\READY TO DESTROY IN 2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
supervisors shall be literate and conversant in the English language because of the necessity to <br />read chemical labels, job instructions and signs, as well as the need for conversing with <br />management personnel. Contractor's supervisors shall also be capable of communicating fully <br />with all employees in the event they do not speak English. <br />The Contractor shall comply with and ensure that the Contractor's personnel and subcontracted <br />personnel comply with all current applicable local, state and federal policies, regulations and <br />standards relating to safety and health. The Contractor shall provide or cause to be provided all <br />training, technical expertise, qualified personnel, equipment, tools and material to safely <br />accomplish the work specified to be performed by the Contractor. The Contractor shall provide <br />all necessary barricades, signs to indicate safety conditions, detours and yellow safety caution <br />tape as necessary to provide a safe environment. <br />The City may require the removal of any of the contractor's employees who are found to be <br />incompetent, careless or insubordinate; or appears to be alcohol or drug impaired or poses a <br />safety risk. The Contractor shall provide an emergency telephone number where he can be <br />reached during normal operating hours and a telephone number where he can be reached after <br />normal operating hours. <br />6. REMEDY FOR FAILURE TO PERFORM REQUIRED SERVICE <br />Should the contractor fail to perform in accordance to the agreement, the City may withhold a <br />portion or all of the contractor's payment for work not performed for each inspection. This <br />estimate is solely determined by the City, and may be based on the costs submitted by <br />contractor in Section V.A. B. Specialized Services. <br />The Director's designated representative shall regularly inspect the parks restrooms and all <br />other City property subject to this Agreement. If said inspection results in discovery of work <br />that is not performed in the manner, and to the professional degree set forth in the <br />Specifications, Contractor agrees that the City shall deduct from Contractor's next monthly <br />payment, the cost of performing the work to bring the property into conformance with the <br />Specifications. Additionally, City shall impose liquidated damages of up to $300.00 per <br />inspection, per park restroom not meeting the Specifications during any such inspection. <br />7. DAMAGE TO CITY PROPERTY <br />Damage or theft of City property resulting from Contractor's performance of the work or <br />negligence shall be repaired immediately by the Contractor or the damage will be repaired by <br />the City at the Contractor's expense, if the Contractor fails to remedy such damage promptly. A <br />written report of the loss and cause of damage must be submitted to the City in writing 24 hours <br />of occurrence <br />8. METHOD OF PAYMENT <br />The vendor will be paid monthly in arrears for his/her services after verification of completion <br />of work and receipt of invoice. Payment terms will be net 30. <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.