Laserfiche WebLink
<br />RESOLVTlON 1101 <br /> <br />REVl!NUE <br />ACCOUNT DEPARTMENTIMlSCELLANEOUS FEE OR SERVICE <br /> <br />UNIT <br /> <br />SEmON IX PLANNING &< BUILDING AGENCY <br />The determination of total valuation sball be made by the <br />Building Official. The value to be used ,hall be the total <br />value of aU construction work for which the permit is iMWld <br />using the building valuation data based upon in the most <br />recent odition ofBuildmg SWldatds published by the <br />International Conference ofBuitding Oft"tcial. The value of <br />work performed as a remodel and olher valuations not <br />p.lbH,hod by the lnl<rnational Conference ofBuildmg <br />Officials shall be determined by the Building Official. <br /> <br />S911 PARKING LOT RESURFACING AND/OR REPMl'\TIXG <br /> <br />Existing parking lot resurfacing and/or repainting. fee shall <br />be based on Ihe value of the work perfonncd. <br /> <br />59]l UNDERGROUND TANK REMOVAL <br /> <br />Underground l>nk removal and baclctill fee sball be based <br />upon valuation. <br /> <br />S911 EXCAVATION FOR SOIL CONTAMINATION <br /> <br />Excavation and backfiU related. to soil contamination fee shall <br />be based upon valuation. <br /> <br />BUfLDI:'I'G PERMIT FEE SCHEDULE <br />(FEES BASED UPON VALUATlONOFWORKj <br /> <br />TOTAL VALUATION <br /> <br />FEE <br /> <br />Sl.OO TO $500.00 <br /> <br />121.00 <br /> <br />$501.00 TO S2ooo.oo <br /> <br />121.00 for Ibe r"" $500.00 plus $3.25 <br />for eacb additional Sloo.oo or ftaction <br />thereof, to and including $2,000.00 <br /> <br />$2,00 I ,00 TO $25.000.00 <br /> <br />569.75 for the r.... 52,000.00 plus S10.50 <br />for eacb additional $ 1.000.00 or_ <br />thereof, to and including $25,000.00 <br /> <br />525,00 1.00 TO 550,000.00 <br /> <br />$311.25 for the first 125,000.00 plus 57.55 <br />for eac:h additional $1,000.00 or fraction <br />thereof, to and including $50.000.00 <br /> <br />550,001.00 TO $100.000.00 <br /> <br />5500.00 for tho filSt 550.000.00 plus <br />55,40 for oa,h additiooal 51,000.00 <br />or fraction thereof, to and including <br />5100,000.00 <br /> <br />5100,001.00 TO $500,000.00 <br /> <br />$770.00 for the first 5100,000.00 pl\U <br />$4.10 for each additional $1,000.00 <br />or traction thereof, to and including <br />$500,000.00 <br /> <br />45 <br /> <br />Resolution No. 2008-041 <br />Page 52 of 78 <br /> <br />FY07-08 <br />FEES <br /> <br />PROPOSED <br />FY U-09 <br />FEES <br />