Laserfiche WebLink
<br />RESOLUTION %008 <br /> <br />REVENUE <br />ACCOUNT DEPARTMENTIMISCEU....NEOIJS FEE OR SJ:RVlCi. <br /> <br />SECTION IX PLANN1NG" BllILDING AGENCY <br />5918 5) Inspccti... for wbil:h no fee i. specifically <br />indicated (minimwn charge - one (l) hour) <br /> <br />SOLAR ENERGY CODE <br /> <br />5914 <br /> <br />Any pen:on desiring a permit required by the Solar EIIergy <br />Code shall. at the time offilina an epplication. pay a fee of <br />$6.00 toWards the Sta1c Mandated Trainina: Prosram and <br />a fee equal 10 530.75 plus the swn of1be fees for the work to <br />be done under the permit as set forth in the following <br />schedule, There is no minimum fee for the issuance of a <br />permit for single 1imily resilknccs and duplexes. The <br />minimum total fee for issu.ancc of a permit for all olber U5e$ <br />sbaJl be $60.00. <br /> <br />(NOTE: These fee! do DOl include permit fees for any <br />pam of the solar erttrgy system wbilOh arc subject to the <br />requimnents of other IpPlicablc codes.) <br /> <br />nE SCHEDULE <br /> <br />5914 J) Forcollec:ton;(inc1udingrelatedpipingand <br />tqlIlIatlns deviCCl): <br /> <br />Up to 1,000 sq. ft. (93m') <br /> <br />BclWeen 1,001 (93.lm') and 2,000 sq. a.(186m') <br /> <br />More <ban 2,000 sq. ft. (ISm') <br />plus per 1,000 sq.ft. (93m2) or fraction <br />1bereof over 2.000 sq. It (186m') <br /> <br />5914 2) For storage tanks (including related piping and <br />rquJating devices): <br /> <br />Up to 750 gallo.. (3m') <br /> <br />Between 751 (3m') and 2,000 gall... <br /> <br />More <hID 2,000 (8m ') plJons <br />plus per 1,000 (4m') or_on tbmof <br />over 2,000 gallo.. (8m') <br /> <br />5914 3) For rock. sloragc: <br /> <br />Up to 1,500 cu. ft. (42m ') <br /> <br />DelW= 1,501 (42.lm') and 3,000 cu. It (84m') <br /> <br />Man: than 3.000 eu. ft:. (84mJ) <br />plus per ) ,000 w. ft. (28m 1 or fraction <br />thereof over 3.000 cu. ft. (84m) <br /> <br />56 <br /> <br />UNIT <br /> <br />PROPOSED <br />IT 07" FY 08-09 <br />FEES FEES <br /> <br />Per Hour <br /> <br />Eacb <br />Permit <br /> <br />74.00 <br /> <br />35.50 <br /> <br />57.15 <br /> <br />S.75 <br /> <br />14.75 <br /> <br />14.75 <br />1.55 <br /> <br />7.50 <br /> <br />13.50 <br /> <br />13.50 <br />1.55 <br /> <br />8.15 <br /> <br />14.75 <br /> <br />14.75 <br />1.55 <br /> <br />77.00 <br /> <br />36.75 <br /> <br />60.00 <br /> <br />910 <br /> <br />15.35 <br /> <br />15.35 <br />1.60 <br /> <br />7.80 <br /> <br />14.00 <br /> <br />14.00 <br />1.60 <br /> <br />9.10 <br /> <br />15.35 <br /> <br />15.35 <br />1.60 <br /> <br />Resolution No. 2008-041 <br />Page 63 of 78 <br />