My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KOA CORPORATION 1A
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
K-L (INACTIVE)
>
KOA CORPORATION 1A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 12:35:29 PM
Creation date
7/29/2008 11:22:25 AM
Metadata
Fields
Template:
Contracts
Company Name
KOA CORPORATION
Contract #
A-2008-122
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2009
Insurance Exp Date
6/15/2009
Destruction Year
2014
Notes
Amends A-2007-159
Document Relationships
KOA CORPORATION (KATZ, OKITSU & ASSOCIATES)
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\K-L (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />a TO THE CITY OF SANTA ANA FOR <br />ENVIRONMENTAL CONSULTANTS -TRAFFIC STUDY <br />VI. Mitigation Measures (if necessary) <br />VII. Specific Analysis <br />VIII. General Issues <br />IX. Conclusions <br />The following terms define elements of the work approaches: <br />I Existing Conditions <br />Existing traffic conditions include establishing the circulation characteristics within the study area including <br />mid -block lane configuration, intersection geometry/controls and pedestrian, bicycle, parking and transit <br />facilities. The study area shall include all the streets and intersections. KOA will obtain and review recently <br />completed traffic impact studies and other pertinent information for projects in the areas surrounding the <br />Project. <br />Mid -Block Locations Analysis <br />All mid -block segments associated with the intersections listed in Task 2 shall be included in the analysis. <br />Cumulative Project Analyses <br />Traffic analyses include traffic forecasts for foreseeable cumulative projects plus ambient traffic growth. <br />The cumulative projects list will be developed by the City of Santa Ana Planning & Building Agency (PBA). <br />KOA will generate project traffic and cumulative project traffic using ITE trip generation rate. Trip tables <br />will be reviewed by the Public Works Agency (PWA) prior to the subsequent stages of the analysis. The <br />trips will then be distributed and assigned to the circulation network. <br />Ultimate Project Build -Out Scenario <br />Ultimate project build -out assumes full build -out of the Project. The latest version of OCTAM will be used <br />to generate, distribute and assign traffic. <br />Traffic impact Analysis <br />Traffic Impact Analyses include the calculation of Level of Service (LOS) for each of the study road <br />segments, intersections, and ramp locations. The road segment LOS will be determined using the <br />methodology presented in the County CMP. The LOS for signalized intersections at Caltrans ramps will be <br />based on the Highway Capacity Manual (HCM) methodology. The LOS for unsignalized intersections will be <br />based on the HCM methodology. LOS for local streets will be based upon an ADT/speed methodology <br />approved by the City. Project -related traffic impacts based on a comparison of the results of LOS analyses <br />between the applicable scenarios listed above will be identified. Project impacts will be based on City <br />standards and will be identified based on the various project phases and the full build -out scenario. <br />KOA CORPORATION <br />PLANNING & ENGINEERING <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.