My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PBS&J 3
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PBS&J 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 12:59:16 PM
Creation date
7/29/2008 2:33:34 PM
Metadata
Fields
Template:
Contracts
Company Name
PBS&J (ATKINS NORTH AMERICA INC)
Contract #
A-2008-128
Agency
PLANNING & BUILDING
Council Approval Date
6/2/2008
Expiration Date
6/30/2009
Insurance Exp Date
9/30/2011
Destruction Year
2016
Notes
Amended by A-2008-128-001, -002 4/1/11 - OFFICIAL NAME CHANGE TO ADKINS NORTH AMERICA INC.
Document Relationships
PBS&J 3a
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
PBS&J 3b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ei <br />Statement of Qualifications <br />to Provide As-Needed <br />Environmental Services <br />• Overall Project Review: attainment of <br />stated goals; client satisfaction <br />• Report Content: technical accuracy; <br />presentation and readability; overall <br />appearance <br />• Report Format: clarity of organization; ; <br />conformance with requirements; <br />accessibility of information; quality of <br />graphics <br />• Editing: quality of writing; technical <br />accuracy; spelling and grammar <br />• Database: use of latest technical and <br />professional information <br />• Information: validity of field surveys; <br />accuracy of area -wide and regional <br />information, site photographs, and maps <br />• Legal Adequacy: compliance with <br />regulatory standards, environmental case <br />law, and new legislation <br />An editor will be assigned specifically to <br />conduct a comprehensive and detailed edit of <br />the document to ensure: (1) compliance with <br />the editorial standards of the Chicago Manual <br />of Style, (2) consistent use of project- specific <br />terms, and (3) consistent formatting /graphic <br />appearance. A well - edited document allows the <br />reader to focus on significant issues, rather than <br />distracting the reader with insignificant errors. <br />Depth of In -House Resources <br />We customarily commit the staff hours and <br />resources necessary to meet our client's schedule, <br />even when it is accelerated. We recognize that <br />in order to provide effective services, staff must <br />be accessible to the City at all times. We are <br />prepared to provide you with all of the resources <br />necessary to remain accessible and achieve <br />the project schedule while producing quality <br />environmental documentation. <br />As noted previously, PBS &J is a full- service <br />engineering and environmental consulting <br />firm that has the depth of resources necessary <br />to evaluate all potential technical issues in- <br />house. Collectively, our firm of over 4,000 <br />professionals, including 230 experts in <br />California, will be made available to the City <br />when you need us. <br />0412 001609 0408 <br />From Vision to Reality ... PBS£3J <br />Schedule and Budget Control <br />PBS &J will be cost effective by managing each <br />individual work authorization closely. As PBS &J <br />has grown over its 48 years in business, we have <br />developed a strong and consistent approach <br />to managing our staff and subconsulting team <br />members to ensure that our clients receive the <br />most technically accurate, cost - effective, and <br />schedule- sensitive services. Our management <br />approach includes initiation of regular and <br />formal lines of communication, efficient use of <br />meetings, strong and reliable project reporting <br />and management systems, and experienced <br />project management. Our strength in effectively <br />managing projects translates to a cost savings for <br />our clients. The ability to meet project schedules <br />and budgets is a clear indicator of efficient project <br />management. PBS &J has a long history of <br />accomplishing this outcome on a wide variety of <br />projects. <br />PBS &J maintains a job -order cost accounting <br />system for the recording and accumulation of <br />costs incurred under its contracts. Each project <br />is assigned a job number so that costs may be <br />segregated and accumulated in our job -order cost <br />accounting system. Our computerized accounting <br />system provides information directly to the desk <br />of each staff member, which allows them to track <br />budgets throughout the life of a project. Our <br />accounting system tracks project expenditures by <br />phase and task and desegregates labor charges by <br />staff member, and expenses and subconsultants' <br />charges by the nature of the expenditure. Project <br />managers are encouraged to track budget <br />compliance on a bi- weekly basis, and are required <br />to provide a monthly financial status report on all <br />projects to senior management. <br />
The URL can be used to link to this page
Your browser does not support the video tag.