My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE, COUNTY OF - 2008
Clerk
>
Contracts / Agreements
>
O
>
ORANGE, COUNTY OF
>
ORANGE, COUNTY OF - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:31:46 PM
Creation date
9/15/2008 2:58:22 PM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE, COUNTY OF
Contract #
N-2008-110
Agency
FIRE
Expiration Date
6/30/2012
Insurance Exp Date
9/14/2008
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Contractor will provide a Best Practices for Use Guide as part of the Implementation. Clients' typical needs <br />in this phase are: identification of User Rights and Roles for system use and establishment of best practices <br />policies and procedures. <br /> <br />4. Deliverable 4: Data loading AIld maintenance <br />Contractor will work with the County to load E91 I data and additional data files as needed. Contractor will <br />assign an Integration Specialist to work with the County's team. The upload and update process will be <br />performed in a secure environment. Contractor will provide a system that allows the County to send data over <br />encrypted lines using SSL to ensure data is fully protected. <br /> <br />Deliverable 4.1 - Suecessfu.IIY Loaded Data <br />Contractor will provide the requisite Data Load Report and Certification to the County. <br /> <br />5. Deliverable S: System Test Plan aDd Resula Report <br />Contractor will provide the County with a System Test Plan which includes a Module Test, and Integration <br />Test, and Stress Test, and a Regression Test in accordance with Attachment F, Testing. <br /> <br />Deliverable 5.1 - Perform Svstem Test <br />Contractor will perform the requisite system tests as required by the County in Contractor's existent testing <br />environment or other appropriate environment as governed by the System Test Plan for component and <br />functionality testing for County sign-off. <br /> <br />Deliverable 5.2 - Sntem Test Results ReDOrt <br />Contractor will provide the County with reporting of documented results of each System Test conducted and <br />certifY successful testing results as required. <br /> <br />6. Deliverable 6: User Acceptance Test AIld Test Results Report <br />Contractor will provide User Acceptance Test as required in a simulated environment as required, per <br />Attachment F, Acceptance. <br /> <br />Deliverable 6.1 - User AcceDtanee Test Resula ReDOrt <br />Contractor will provide the required User Acceptance Test Results Report within one week oftests as <br />required per Attachment F, Acceptance. <br /> <br />7. DeUverable 7: System Training and Doeumentation <br />Contractor will provide a detailed training plan, perform user training as desired by the County and provide <br />system documentation training material per Attachment G, Training. <br /> <br />8. DeUverabJe 8: System ImplementatioD <br />Contractor will roll-out Public Mass Notification Services to the County. A post-implementation review <br />report will be developed and provided to the County. <br /> <br />9. DeUverable 9: Performance Benebmark Verification <br />Deliverable 9.1- Performance Benchmark VeriftmtloD Plan <br />Contractor will provide the requested Performance Verification Plan with test plan and scenarios for the <br />County's approval. The Performance Verification Plan shall dovetail with the sample Gantt chart. as <br />customized vis-a-vis the County requirements. <br /> <br />Deliverable 9.2 - Performance Benebmark Verification <br />Contractor shall conduct the Performance Benchmark Verification of the System mutually agreed upon with <br />the County, and complete corrective action as needed, and certifY as such in writing at the time of completion. <br /> <br />10. Deliverable 10: Initiate Post-Implementation Maintenance and Support <br /> <br />Con_NJ0OOOO98S0 <br /> <br />28 <br /> <br />312\10& <br />
The URL can be used to link to this page
Your browser does not support the video tag.