Laserfiche WebLink
Project Manager: Jeff Chapman, PE <br />Project Engineer: Jeff Mills, PE <br />URS prepared schematic, preliminary and final design documents for street, wributFul <br />landscaping and parking lot rehabilitation in the newly appointed <br />"Cornerstone Village" community. The project scope included o?Ro d action <br />nel <br />I to is C tract <br />-tS Part rmed by Key Person <br />reconfiguration of Minnie Street to one-way, landscaping enhancement, asigned too on <br />Pibj <br />pavement overlay and reconstruction, and parking lot renovation. Special r2i7 <br />aesthetic considerations were critical components of this improvement project, which <br />included the addition of landscaped islands, entry pergola, community signage/monument, <br />new street lights and enhanced paving throughout the project. <br />This project was a tremendous success for the City and may provide a prototype for future <br />neighborhood enhancement projects throughout the City. The project received the 2002 <br />Project of the Year award from the Southern California Chapter of the American Public Works <br />Association. Both the schematic and design phases involved extensive local resident, property <br />owner and City agency collaboration. Jeff Chapman and Jeff Mills demonstrated their ability to <br />explore and resolve issues that arose on the project; particularly with respect to building <br />consensus among the variety of stakeholders involved in the project by identifying compromises <br />that allowed the project to continue moving forward. <br />Project Engineer: Jeff Chapman, PE i `Geographic Area <br />Xerox Centre, located near the Santa Ana and Costa Mesa freeways, is a high- e'Fd Iliarity With City Design, Construction <br />rise office development consisting of office towers and parking structures. Specifications and Procedures <br />? Projects Performed by Key Person ; <br />URS prepared designs for improvements to the local streets, sewer, water, and Assigned to this Contract,. <br />nr <br />storm drain facilities to accommodate the high density, 10-acre development. <br />In the preliminary phases of the project, URS provided grading, utility and storm drainage studies, an ALTA survey <br />and a tentative parcel map. Subsequently, street and utility improvement plans, landscaping plans and final parcel <br />maps were prepared. <br />The project included the design of an extension of Cabrillo Park Drive and widening and reconstruction of First and <br />Fourth Streets. Other design elements included storm drain, water and sewer facilities, retaining wall design, landscape <br />and hardscape improvements and traffic signal design and modifications. Construction staging and traffic handling <br />plans and specifications were developed to maintain traffic during construction. URS also assisted during the bidding, <br />contract award and construction phases of the project. <br />Project Manager: Jeff Mills, PE <br />Project Principal: Jeff Chapman, PE ICey Personnel <br />Project Engineer: Stephanie Hillebrand, PE ig rStak ntract <br />T raffic Engineer: Doug Smith, PE, TE Oiis lder Interaction <br />URS is currently providing as-needed engineering design services to the County <br />of Riverside Transportation Department. Jeff Mills is the Project Manager and the following projects represent recent <br />task orders received as part of this effort: <br />? Clinton Keith Road Widening; Riverside, CA - Completing the planning, engineering and environmental <br />studies and initiating the PS&tE for the widening of a two-mile segment of Clinton Keith Road. The work <br />includes layouts/profiles, intersection design, drainage design, utility design, and traffic/electrical design. <br />UM