Laserfiche WebLink
RESOLUTION 2009 - <br />PROPOSED" <br />REVENUE <br />FY 08 -09 <br />FY 09 -10 <br />ACCOUNT <br />DEPARTMENT /MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION XI <br />PUBLIC WORKS AGENCY <br />86 -01 -5921 <br />Storm Drains /Culverts, Sewer, Water Mains /Line Channels <br />In Dirt- $127.58 minimum <br />Linear Foot <br />3.97 <br />4.09 <br />Minimum <br />123.85 <br />127.58 <br />In Paving - $127.58 minimum <br />Linear Foot <br />4.52 <br />4.66 <br />Minimum <br />123.85 <br />127.58 <br />86 -01 -5920 <br />Sewer Laterals/Water Services <br />Each <br />275.56 <br />283.85 <br />86 -01 -5921 <br />Traffic Occupancy or Lane Closure Requiring Signage <br />All Streets <br />Per Day <br />258.54 <br />266.32 <br />Minor Streets <br />Deposit <br />817.45 <br />842.06 <br />Major Streets <br />Deposit <br />1,088.37 <br />1,121.13 <br />86 -01 -5921 <br />Manhole, Vaults, Catch Basins and required signage, <br />striping or barricades <br />Plus Earthwork <br />Each <br />207.45 <br />213.69 <br />86 -01 -5921 <br />Curb, Gutter or Combination including Earthwork <br />$127.58 minimum <br />Linear Foot <br />1.68 <br />1.73 <br />Minimum <br />123.85 <br />127.58 <br />86 -01 -5921 <br />Curb Return, including Earthwork <br />$127.58 minimum <br />Each <br />66.57 <br />68.57 <br />Minimum <br />123.85 <br />127.58 <br />86 -01 -5921 <br />Sidewalk including Earthwork <br />$127.58 minimum <br />Sq. Foot <br />0.60 <br />0.62 <br />Minimum <br />123.85 <br />127.58 <br />86 -01 -5921 <br />Drive Approach including Earthwork <br />$127.58 minimum <br />Sq. Foot <br />0.77 <br />0.79 <br />Minimum <br />123.85 <br />127.58 <br />86 -01 -5921 <br />Paving, including Earthwork <br />(0 - 2000 sq. ft.) $127.58 minimum <br />Sq. Foot <br />0.24 <br />0.25 <br />(Over 2000 sq. ft.) $127.58 minimum <br />Sq. Foot <br />0.17 <br />0.18 <br />Minimum <br />123.85 <br />127.58 <br />86 -01 -5621 <br />Street Trees <br />By Developer, Inspection Only - $90.60 minimum <br />Each <br />31.75 <br />32.71 <br />86 -01 -5921 <br />Permanent Street Patch Guarantee <br />Refundable if done in 30 calendar days <br />Sq. Foot <br />31.20 <br />32.14 <br />86 -01 -5921 <br />Projects Exceeding $100,000 and /or <br />Percent of estimated <br />Work items not included here <br />construction costs <br />3.25% <br />3.25% <br />86 -01 -5621 <br />Overtime Rate for Construction Inspectors <br />Per Hour <br />55.70 -59.95 <br />59.35 -63.87 <br />Construction Inspector overtime rate range. Actual overtime hourly - <br />rate based on Inspectors salary step <br />11 -01 -5577 <br />Certificate of Correction <br />Minimum <br />418.02 <br />430.60 <br />Per Hour <br />139.35 <br />143.54 <br />Resolution No. 2009 -030 <br />Page 70 of 79 <br />64 <br />