Laserfiche WebLink
e) Have soils incapable of adequately supporting the use of septic tanks or alternative water disposal <br />• systems where sewers are not available for the disposal of water? (No Substantial Change from <br />Previous Analysis) <br />The EIR included mitigation measures designed to minimize impacts relating to geology and soils. The <br />project will not include the use of septic systems or alternative water disposal systems. No changes <br />have occurred in this area from the analysis provided in the EIR. The development of the project will <br />have no new or more severe impacts beyond those addressed and mitigated in the EIR. <br /> <br />• <br />IV. Hazards and Hazardous Materials <br />The EIR noted that the proposed project could be subject to potentially significant adverse hazards and <br />hazardous materials impacts. Mitigation measures included in the EIR would reduce potential impacts to a <br />level that would be less than significant. <br />Would the project: <br />a) Create a signiftcant hazard to the public or the environment through the routine transport, use or <br />disposal of hazardous materials? (No Substantial Change from Previous Analysis) <br />A Phase I Preliminary Environmental Site Assessment and a Phase II Screening Subsurface Assess- <br />ment were performed and discussed in the EIR. No changes have occurred in this area from that <br />analysis. Therefore, the EIR as certified will remain adequate and complete for this topic. <br />b) Create a significant hazard to the public or the environment through reasonably foreseeable upset and <br />accident conditions involving the release of hazardous materials into the environment? (No <br />Substantial Change from Previous Analysis) <br />Neither the construction nor the operation of the proposed project will involve hazardous materials that <br />might unwittingly be released into the environment. Therefore, there will be no impact due to the <br />accidental release of such materials. The EIR as certified will remain adequate and complete for this <br />topic. <br />c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste <br />within one-quarter mile of an existing or proposed school? (No Substantial Change from Previous <br />Analysis) <br />The project involves the construction of a 185-room hotel, and no hazardous or acutely hazardous <br />materials, substances, or waste will be emitted by the normal operation of the project. No changes have <br />occurred in this area from the analysis provided in the EIR. The development of the project will have <br />no new or more severe impacts beyond those addressed and mitigated in the EIR. <br />d) Be located on a site that is included on a list of hazardous materials sites compiled pursuant to <br />Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public <br />or the environment? (No Substantial Change from Previous Analysis) <br />The proposed site is not included on a list of hazardous materials sites and would not create a <br />significant hazard to the public or the environment. No changes have occurred in this area from the <br />analysis provided in the EIR. Therefore, the EIR remains adequate and complete for this topic. <br />MacArthur Place South <br />EIR Addendum <br />Resolution No. 2009-025 <br />Page 35 of 95 <br />37 <br />