My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-034 (2) - Final Supplemental Environmental Impact Report for Fairhaven/Lincoln
Clerk
>
Resolutions
>
CITY COUNCIL
>
2000 - 2010
>
2009
>
2009-034 (2) - Final Supplemental Environmental Impact Report for Fairhaven/Lincoln
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2015 1:21:03 PM
Creation date
7/20/2009 5:23:52 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2009-034
Date
7/6/2009
Destruction Year
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2,. Introduction <br />2.2 NOTICE F PREPARATION AND INITIAL STUDY <br />The City of Santa Ana determined that an EIR gourd be required for this project and issued a Notice of <br />Preparation (N OP) and Initial Study (See Appendix A). Corn ments received during the public revie v eriod <br />which extended from October , 2008, to November 2, 2008, are contained in Appendix B � } <br />. <br />The NOP process is used to help determine the scope of the environmental issues to be addressed in the <br />Draft SEI R. Based on this process and the Initial Study for the project, certain environmental categories were <br />identified as having the potential to result in significant impacts. Issues considered Potentially Significant are <br />addressed in this Craft SEIR. Issues identified as Less Than Significant or No Impact are not addressed <br />beyond the discussion contained in the initial Studer. Refer to the Initial Study In Appendix A for discussion of <br />how these initial determinations have been made. <br />Z3 SCOPE OF THIS DRAFT SEIR <br />Based upon the I nitial Study and Environmental Check list Form, the City of Santa Ana staff determined that a <br />Draft SElR should be prepared for the proposed project. The scope of the Draft SElR was determined based <br />upon the Initial Study, and comments received in response to the NOR Pursuant to Sections 15126.2 and <br />15126.4 of the State CEQA Guidelines, the EIR should identify any potentially significant adverse impacts <br />and recor-n men d mitigation that wouId reduce or elirninate these impacts to I eve Is of insignificance, <br />The information contained in the Project Description establishes the basis for analyzing future project- related <br />environmental impacts, <br />2.3.1 Impacts Considered Less Than Significant <br />Thirteen environmental impact categories are identified here as not being significantly affected by or affecting <br />the proposed Fairhaven /Lincoln and Santa Clara /Lincoln Intersection Modifications project, and therefore are <br />not discussed in detail in this Draft SEIR. The following topical issues are not addressed in the Draft SEIR: <br />• Aesthetics <br />• Agricultural Resources <br />* Biological Resources <br />• Cultural Resources <br />0 Geology /Soils <br />• Hazards & Hazardous Materials <br />• Hydrology/ Water Quality <br />• Land Use/Planning <br />0 Mineral Resources <br />• Population /Housing <br />• Public Services <br />0 Recreation <br />• Utilities /Service Systems <br />Page 2-2 & The Planning Center March 2009 <br />Resolution No. 2009 -034 <br />Page 24 of 130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.