Laserfiche WebLink
The following documents will be updated or finalized: <br />• Roadway Special Provisions <br />• Roadway Engineer's Estimate <br />• Final Hydrology /Drainage Report <br />• Final Storm Water Data Report (SWDR) <br />• Final Traffic Management Plan (TMP) <br />• Final Construction CPM Schedule <br />The following draft document will be submitted with the 95% submittal: <br />Task 7.3 Draft Storm Water Pollution Protection Plan (SWPPP) <br />Huitt - Zollars will prepare a Notice of Intent (NO1) and a draft Storm Water Pollution Protection Plan to satisfy the <br />Water Quality Control Board for the National Pollutant Elimination System Program (NPDES). Huitt- Zollars will <br />acquire necessary dewatering permit for foundations construction. <br />Deliverables: Huitt- Zollars will submit 40 sets of 95% plans, reduced to 11" x 17" size, Roadway Special <br />Provisions, an Engineer's Estimate, 4 copies of the Hydrology /Drainage Report, 4 copies of the SWDR 4 copies of <br />the Traffic Management Plan, and 4 copies of the Construction CPM Schedule. <br />TASK 8.0 STRUCTURES PS &E <br />Task 8.1 Structure Type Selection Report <br />The Huitt- Zollars Team will produce, submit and present the Type Selection Report for the bridge replacement and <br />special design retaining walls, if applicable. The Huitt - Zollars Team will schedule, hold, run and document a Type <br />Selection Review Meeting, in Sacramento, to discuss and provide information on foundation and false work <br />requirements, proposed seismic design criteria, aesthetics, traffic handling, and other pertinent information related to <br />bridge design, construction and maintenance. The Huitt- Zollars Team will perform drainage design calculations for <br />the proposed bridge deck drainage systems and prepare a Bridge Drainage Report. The Type Selection Report will <br />contain a General Plan; General Plan Estimate; Vicinity Map; Type Selection Memo; and Project Seismic Design <br />Criteria. (A separate Advance Planning Study is not included in this Scope of Work.) <br />Deliverables: The Huitt- Zollars Team will complete Type Selection submittal. After receiving written approval of <br />the proposed General Plan and structure type, the Huitt- Zollars Team will furnish OSFP with 15 copies of the Type <br />Selection Report; 2 copies Draft Foundation Plan; 4 copies Bridge Drainage Report; 40 copies Approved General <br />Plan. <br />Task 8.2 Structures 60% PS &E (Unchecked Details) <br />Upon approval of the structure type, the Huitt- Zollars Team will perform a complete structural design for the <br />overcrossing and retaining walls, if applicable. The bridge is assumed to be a two -span, cast -in -place concrete <br />box girder, which will be constructed in two stages. The structure design will be coordinated with the development <br />of the Foundation Report to ensure the proper selection of foundation type and proper development of foundation <br />capacity. The Huitt- Zollars Team will develop draft details to ensure compatibility with the structural calculations. <br />The following sheets are anticipated: <br />• General Plan <br />• Index to Plans <br />• Deck Contours <br />• Foundation Plan <br />• Abutment Layout <br />• Abutment Details <br />• Bent Layout <br />• Bent Details <br />