My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PBS&J 3a
Clerk
>
Contracts / Agreements
>
INACTIVE CONTRACTS (Originals Destroyed)
>
P (INACTIVE)
>
PBS&J 3a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/23/2021 2:58:55 PM
Creation date
4/28/2010 1:27:10 PM
Metadata
Fields
Template:
Contracts
Company Name
PBS&J (ATKINS NORTH AMERICA INC)
Contract #
A-2008-128-001
Agency
Planning & Building
Council Approval Date
6/2/2008
Expiration Date
6/30/2010
Insurance Exp Date
9/30/2010
Destruction Year
2016
Notes
Amends A-2008-128 Amended by A-2008-128-003 - 4/1/11 OFFICIAL NAME CHANGE TO ATKINS NORTH AMERICA INC.
Document Relationships
PBS&J 3
(Amends)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
PBS&J 3b
(Amended By)
Path:
\Contracts / Agreements\ INACTIVE CONTRACTS (Originals Destroyed)\P (INACTIVE)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
> Mid -Block Segments <br />II. Project Related Traffic Volumes <br />III. Traffic Changes Based Upon Circulation System Improvements <br />IV. Ultimate Build -Out Scenario <br />V. Traffic Impact Analysis <br />> Existing Conditions (2010) <br />> Opening Year 2030 without the Project <br />> Opening Year 2030 with the Project <br />> Opening Year 2030 with the Project with Mitigation (if needed) <br />> General Plan Build -out without the Project <br />> General Plan Build -out with the Project <br />> General Plan Build -out with the Project with Mitigation (if needed) <br />VI. On -site Circulation <br />VII. Mitigation Measures (If Necessary) <br />VIII. General Issues <br />IX. Conclusions <br />Existing Conditions <br />Existing traffic conditions include establishing the circulation characteristics within the study area <br />including mid -block lane configuration, intersection geometry/controls, and pedestrian, bicycle, <br />parking, and transit facilities. <br />Mid -Block Locations Analysis <br />Mid -block segment analysis associated with the intersections identified in Task 2 shall be included in <br />the analysis. <br />Interim Traffic Analyses <br />Interim traffic analyses include traffic forecasts for all project phases and the associated proposed <br />and foreseeable cumulative projects plus ambient traffic growth. The cumulative projects list will be <br />developed by the City of Santa Ana. KOA will generate project and cumulative projects traffic using <br />ITE trip Generation. Trip forecasts will be reviewed by the City prior to the subsequent stages of <br />the analysis. The trips will then be distributed and assigned to the circulation network. <br />Ultimate Build -Out Scenario <br />Ultimate build -out assumes full build -out of the proposed plan together with all approved project <br />within the study vicinity at time of this proposal. <br />Traffic Impact Analysis <br />The Traffic Impact Analyses will include the calculation of LOS for each of the study road <br />segments, ramp segments, and intersections. The road segment LOS will be determined using the <br />methodology presented in the County MPAH. The LOS for signalized intersections at Caltrans <br />
The URL can be used to link to this page
Your browser does not support the video tag.