Laserfiche WebLink
Subtask 3a Respond to City Comments on the Administrative Draft <br />EIR <br />PBS&J will obtain all comments on the Administrative Draft EIR from the City's project <br />coordinator, who will compile one set of unified City comments for use in revising the document. <br />PBS&J will complete revisions to the Administrative Draft EIR in conformance with the City's <br />comments, and the agreed -upon scope of work and schedule. <br />Subtask 3b Distribute Draft EIR <br />PBS&J will provide the City with fifty (50) copies of the Draft EIR after the City approves final <br />drafts, including the fifteen (15) copies (as required by the Governor's Office of Planning and <br />Research/State Clearinghouse) of the Draft EIR to be filed at the State Clearinghouse. It is assumed <br />that the City would be responsible for preparation of the Notice of Completion and any filing fees. <br />Output <br />1. Distribute fifty (50) bound copies of the Draft EIR for public review (this number includes 15 <br />copies of the Draft EIR that are submitted to the State Clearinghouse). Should the City <br />determine that additional copies of the Draft EIR are necessary; their production would be <br />treated as an Optional Task. <br />2. Provide one (1) clean reproducible original of the Draft EIR and one (1) electronic copy. <br />d. Task 4 Prepare Administrative Final EIR and Draft MMP <br />(Response to Draft EIR Comments) <br />This task will result in the preparation of a Preliminary Final EIR, which will contain a list of <br />commenters, comment letters, responses to comments on the Draft EIR, Draft EIR text revisions, <br />the Draft EIR itself, and the Draft Mitigation Monitoring Program (MMP). <br />Subtask 4a Prepare Administrative Final EIR (Response to <br />Comments) <br />The City's project planner will compile and transmit all written comments on the Draft EIR <br />throughout the public review period and as one unified set of comments following the close of the <br />public review period. PBS&J will confer with City staff to review written comments on the Draft <br />EIR, including comments from public meetings and hearings, to develop a general strategy for <br />preparation of responses. The Administrative Final EIR will be submitted to City staff for review <br />and comment. <br />Subtask 4b Prepare Draft MMP <br />The objective of this subtask is to ensure compliance with Public Resources Code Section 21081.6, <br />as mandated by Assembly Bill 3180 (Cortese 1988), which requires a lead agency to adopt a <br />mitigation monitoring program (MMP) at the time an EIR is certified. <br />