PBS&J will prepare a Draft MMP concurrently with the preparation of the Administrative Final <br />EIR, upon finalization of project mitigation measures. The MMP will be designed to ensure <br />compliance with all adopted mitigation measures during project implementation. The MMP will be <br />in table format, and will specify mitigation measures, standards of success, conditions of approval, <br />parties responsible for implementation and monitoring, funding sources, timing and frequency, <br />criteria to determine compliance with conditions, and provisions for remedial measures (if the <br />success standards are not achieved). <br />The MMP will be designed to fit into the City's existing entitlement and project review process. <br />Output <br />1. Distribute eight (8) unbound copies of the Administrative Final EIR and Draft MMP for City <br />staff review. <br />2. One (1) electronic copy of the Administrative Final EIR and Draft MMP. <br />e. Task 5 Prepare Final EIR and Final MMP <br />The objective of this task is to prepare a Final EIR that incorporates City comments on the <br />Administrative Final EIR. <br />Subtask 5a Prepare Final EIR (Response to Comments) <br />PBS&J will obtain all comments on the Administrative Final EIR from the City's project <br />coordinator, who will compile one set of unified City comments for use in revising the document. <br />PBS&J will complete revisions to the Administrative Final EIR in conformance with the City's <br />comments and the agreed -upon scope of work. <br />Responses that are within this proposal's scope of work and budget consist of explanations, <br />elaborations, or clarifications of the data contained in the Draft EIR. If new analysis, issues, <br />alternatives, or substantial project changes need to be addressed, or if the effort exceeds the budget <br />amount because of the number or complexity of responses, a contract amendment may be needed. <br />The format of the Final EIR will be as a single document that includes the Draft EIR, comment <br />letters, responses to comments, text revisions, the MMP, and any other appropriate information. It <br />is assumed that the Final EIR will be distributed at least ten days prior to the EIR certification <br />hearing. <br />Subtask 5b Prepare Final MMP <br />After review and comment on the Draft MMP, PBS&J will revise the MMP, according to the <br />comments provided, and will submit the Final MMP to the City with the Final EIR. <br />Output <br />1. Distribute twenty-five (25) copies of the Final EIR and Final MMP. Production of the Final <br />EIR is not included in the attached cost proposal. Should the City determine that PBS&J <br />produce the Final EIR copies; their production would be treated as an Optional Task. <br />