My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP 4 - 2010
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP 4 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:49:11 PM
Creation date
5/11/2010 11:31:38 AM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2010-053
Agency
PUBLIC WORKS
Council Approval Date
3/15/2010
Expiration Date
6/30/2011
Insurance Exp Date
4/30/2011
Destruction Year
2016
Notes
WC Exp: 01/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38 <br />such as high ongoing maintenance requirements, the ability of the existing facility to accommodate future <br />growth, constraints and significant flaws with the existing design that would offset potential savings with <br />maintaining the existing facility with moderate to minor improvements. <br />Three alternative scenarios would be created to be explored further in subsequent tasks. This would <br />include the following: <br />1. Maintain the existing SARTC facility with minor upgrades <br />2. Significant retrofits to the SARTC to enhance the facility <br />3. Replace the SARTC with a new facility <br />Deliverables: <br />• Building Space Requirements Summary Report, Matrices and Bubble Diagrams <br />• Technical memorandum describing the three alternative scenarios <br />Task 33 Parking and Site Requirements <br />Objective: To identify parking demand and loading/delivery requirements at the SARTC. <br />Approach: An increase in passenger service from existing and future transportation providers will require <br />a review of parking demand, loading and delivery of passengers, on site employees and other providers. <br />The new and future transportation provider's on-site employees, as well as other uses such as potential <br />restaurants, retail and commercial uses can create higher usage activity in the building and surrounding site. <br />IBI Group will inventory the existing building's surface parking and garage parking spaces and conditions <br />to determine if these facilities can accommodate an increase in auto traffic. <br />The IBI Group Team will prepare a parking study that will address the provision and management of <br />parking in the station area, including on-street parking, surface parking, parking structures, short and long <br />term parking needs for commuters. Large portions of the SARTC site include surface parking lots and <br />underutilized site area. The study will determine highest and best use of the site area and will evaluate <br />parking needs as summarized in Task 2. Options of how to incorporate expanded parking, vehicular <br />access, and loading will be explored and opportunities/issues highlighted. <br />`f Deliverables: <br />Technical Memorandum evaluating the numbers, types and sizes of parking spaces, location and size <br />of structures, loading strategies, vehicular access, and circulation
The URL can be used to link to this page
Your browser does not support the video tag.