My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IBI GROUP 4 - 2010
Clerk
>
Contracts / Agreements
>
I
>
IBI GROUP 4 - 2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2012 2:49:11 PM
Creation date
5/11/2010 11:31:38 AM
Metadata
Fields
Template:
Contracts
Company Name
IBI GROUP
Contract #
A-2010-053
Agency
PUBLIC WORKS
Council Approval Date
3/15/2010
Expiration Date
6/30/2011
Insurance Exp Date
4/30/2011
Destruction Year
2016
Notes
WC Exp: 01/13/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
39 <br />? Task 4 - PhysicalConstraints Analysts <br />Task 4.A Physical Constraints <br />Objective: To inform the Master Plan through a full understanding of factors having bearing on any <br />proposed facilities at the site, including: overall site size, shape, location, zoning conditions, and adjacent <br />projects so that convenient inter-modal access can be achieved along with the best possible urban <br />integration of the station site. <br />Approach: The size, shape and location of the existing site will be significantly influenced by all of the <br />newly proposed transportation providers, additional parking, vehicle and pedestrian access. A maintenance <br />facility for the Santa Ana Fixed Guideway project will require additional site area for buildings and vehicle <br />storage. The Santa Ana Boulevard Grade Separation project at the existing track crossing will impact the <br />existing surface parking along the north edge of the SARTC site. <br />A comprehensive site analysis of the station, parking, maintenance facility, surrounding streets and <br />properties will be developed to ensure that the design process is informed with an understanding of the <br />sites, neighborhood connectivity, land use, zoning plans, SARTC District development concepts, TOD <br />concepts, the proposed Santa Ana Guideway project and Santa Ana Boulevard Grade Separation project. <br />The Task will include the compilation and evaluation of baseline data, preparation of detailed base maps, <br />overlay maps and the development of an urban design report. The planning for the station, maintenance <br />facility and track alignments will be undertaken within a 1/a mile radius of the station. <br />Deliverables: <br />• Physical Constraints Technical Memorandum <br />• Urban Design Framework Maps <br />• Land Use Map <br />• Station Area Map and Site Plans <br />• TOD Map <br />• Existing Conditions Map and Aerial <br />• Transportation and Parking Map <br />• Vehicular Circulation <br />• Open Space Amenities, Bicycle and Pedestrian Access Map <br />City of Santa Ana <br />Santa Ana Regional Transportation Center Master Plan IBI Group 1.25.10
The URL can be used to link to this page
Your browser does not support the video tag.