Laserfiche WebLink
9 FINDINGS REGARDING PROJECT ALTERNATIVES <br />Finding: The City Council rejects the Buildout of the Zoning Designation Alternative, on the <br />following grounds, each of which individually provides sufficient justification for rejection of this <br />alternative: (1) this alternative would not achieve the basic project objectives of developing a <br />residential mixed -use residential project and would not implement the GPU's vision for the South <br />Bristol Street Focus Area; and (2) the alternative is technically, financially, and legally infeasible <br />given that the existing development at the Project site is reflective of the standards established <br />under SD-48 and it is not realistic the site would be redeveloped with new or modified commercial <br />uses consistent with the existing SD-48 zoning Thus, this alternative was eliminated from <br />further consideration <br />9.1.2 Off -Site Alternative <br />According to State CEQA Guidelines Section 15126.6[f][2][A], only locations that would avoid or <br />substantially lessen any of the significant effects of the project need be considered for inclusion <br />in the EIR. The Project would not cause any new significant impacts or substantial increase in <br />previously identified significant impacts from those identified in the GPU PEIR. <br />As discussed in the project objectives, a fundamental purpose of building out the Project at the <br />selected Project site is to implement the vision and objectives established in the City of Santa Ana <br />General Plan for the South Bristol Street Focus Area, primarily to transform auto -oriented <br />shopping plazas into walkable, bike -friendly, and transit -friendly urban villages. Thus, the Project <br />would redevelop an existing auto -oriented plaza that has already been disturbed by previous uses <br />and is served by existing services, avoiding the need for new construction at an undeveloped site. <br />Additionally, due to their age, the existing buildings at the South Coast Plaza Village have <br />outdated infrastructure, which results in operational inefficiencies and outdated seismic <br />code compliance. <br />The Project site is located in a fully developed urban area of the City of Santa Ana and acquiring <br />off -site property may not be financially reasonable or logistically feasible. Acquiring new property <br />outside of the existing project site would also not eliminate the need to transform the existing auto - <br />oriented shopping plazas in the South Bristol Street Focus Area into urban villages. Furthermore, <br />there are limited, if any available properties comparable to the Project site of sufficient size, <br />dimensions, and land use designation (District Center), and without existing residences that would <br />otherwise require displacement within the GPU-identified South Bristol Street Focus Area and <br />South Coast Metro Area that would allow for high -intensity mixed uses. <br />Finding: The City Council rejects the Off -Site Alternative, on the following grounds, each of which <br />individually provides sufficient justification for rejection of this alternative: (1) the alternative would <br />not meet project objectives; and (2) acquiring off -site property may not be financially reasonable <br />or logistically feasible. For these reasons, this alternative has been eliminated from <br />further consideration. <br />9.2 ALTERNATIVES SELECTED FOR FURTHER ANALYSIS <br />The following alternatives were selected for evaluation in Section 6.6 Alternatives Selected for <br />Further Analysis of the Draft Supplemental EIR: <br />• Alternative 1: No Project/No Build Alternative <br />• Alternative 2: Reduced Project Alternative <br />• Alternative 3: Reduced Project with No Subterranean Parking Alternative <br />City of Santa Ana The Village Santa Ana Specific Plan Project <br />August 2025 CEQA Findings of Fact and Statement of Overriding Considerations <br />9-3 <br />