My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2025
>
09/16/2025
>
Item 28 - Public Hearing - Amendment Application for the Village Santa Ana Specific Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2025 9:35:07 AM
Creation date
9/10/2025 8:39:48 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
28
Date
9/16/2025
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
374
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 NO ENVIRONMENTAL EFFECTS AND LESS THAN SIGNIFICANT <br />ENVIRONMENTAL EFFECTS WITHOUT MITIGATION MEASURES <br />Findings: The City finds that the Project would result in no impact to wildfire related to requiring <br />the installation or maintenance of associated infrastructure that may exacerbate fire risk or that <br />may result in temporary or ongoing impacts to the environment. (Draft Supplemental EIR, p. 5-14.) <br />Explanation of the Rationale: As previously discussed, the Project site is located within the City, <br />which is not located in or near a state responsibility area or lands classified as a VHFHSZ. <br />Therefore, the Project would not require the installation or maintenance of associated <br />infrastructure that may exacerbate fire risk or that may result in temporary or ongoing impacts to <br />the environment, and no impact to wildfire would occur. (Draft Supplemental EIR, p. 5-14.) <br />Threshold W-4: The Project would not expose people or structures to significant risks, <br />including downslope or downstream flooding or landslides, as a result of <br />runoff, post -fire slope instability, or drainage changes. <br />Findings: The City finds that the Project would result in no impact to wildfire related to exposing <br />people or structures to significant risks due to runoff, post -fire slope instability or drainage <br />changes. (Draft Supplemental EIR, p. 5-14.) <br />Explanation of the Rationale: As previously discussed, the Project site is located within the City, <br />which is not located in or near a state responsibility area or lands classified as a VHFHSZ. <br />Therefore, the Project would not expose people or structures to significant risks, including <br />downslope or downstream flooding or landslides, as a result of runoff, post -fire slope instability, <br />or drainage changes. No impact to wildfire would occur. (Draft Supplemental EIR, p. 5-14.) <br />Cumulative Impacts: The Project would not result in cumulative impacts concerning wildfire. <br />Findings: The City finds that the Project would result in no cumulative impacts concerning <br />wildfire. (Draft Supplemental EIR, pp. 5-13 — 5-14.) <br />Explanation of the Rationale: The Project site is located within the City, which is not located in <br />or near a state responsibility area or lands classified as a VHFHSZ. Therefore, no cumulative <br />impacts to wildfire would occur. (Draft Supplemental EIR, pp. 5-13 — 5-14.) <br />City of Santa Ana The Village Santa Ana Specific Plan Project <br />August 2025 CEQA Findings of Fact and Statement of Overriding Considerations <br />4-46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.