My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LANDSCAPE WEST MANAGEMENT SERVICES, INC. (12)
Clerk
>
Contracts / Agreements
>
L
>
LANDSCAPE WEST MANAGEMENT SERVICES, INC. (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 8:13:42 AM
Creation date
11/25/2025 1:43:13 PM
Metadata
Fields
Template:
Contracts
Company Name
LANDSCAPE WEST MANAGEMENT SERVICES, INC.
Contract #
A-2025-189
Agency
Public Works
Council Approval Date
11/4/2025
Expiration Date
6/30/2027
Insurance Exp Date
4/1/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> cause for the City to move in on the work site to make corrective work.Such work will be done <br /> on a force account basis with an additional callout charge of$75 for each callout. It should <br /> also be noted that there is a minimum two-hour charge for labor on any callout. <br /> XVI. SAFETY REQUIREMENTS <br /> All work performed under this contract shall be performed in a manner as to provide <br /> maximum safety to the public and staff where applicable, comply with all safety standards <br /> related to personal protective equipment (PPE) required by CAL-OSHA or other applicable <br /> Local, State and Federal safety regulatory agencies. <br /> XVII. ENVIRONMENTAL CONDITIONS <br /> 1. Comply with all applicable local, state, federal regulations and requirements. <br /> 2. Transport, store, apply, dispose of all bio-waste and hazardous materials as required by law. <br /> 3. Supply, if necessary, a trash container,for non-hazardous materials only. <br /> 4. Remove from the work site and properly dispose of all spent materials, hazardous <br /> materials, debris, and the like on a daily basis. Do NOT accumulate waste materials <br /> unless the Projects Manager otherwise allows. <br /> 5. Minimize contamination from materials, wastes, spills, or residues at the jobsite to <br /> street, drainage facilities, or adjoining property by wind or runoff. <br /> XVIII. TRAFFIC CONTROL <br /> All traffic control (if required) shall conform to the requirements of the latest edition of the <br /> "Work Area Traffic Control Handbook" (WATCH, City Standard Plan 1125F (SP1125F), the <br /> Manual on Uniform Traffic Control Devices (MUTCD), the current MUTCD California <br /> Supplement and these Special Provisions. <br /> 1. The Contractor shall maintain at least one open traffic lane in each direction at all time on <br /> all streets. Flagmen shall be required when directed by the City. <br /> 2. During non-working hours, all lanes shall be opened to traffic. <br /> 3. Flashing arrow boards shall be required on arterial streets. Deviation from this <br /> requirement will be subject to approval from the Traffic Engineer. <br /> 4. Traffic control plans must be submitted and approved before starting work on any <br /> public street, except for the following temporary closures: <br /> a. Temporary single lane closure on 4 or 6-lane arterials may be done per <br /> WATCH without submitting atraffic control plan. However, this will require approval <br /> from the Traffic Engineer. <br /> b. Temporary closure of local streets may be done per WATCH without submitting <br /> traffic control plans. However, this will require approval from the Traffic Engineer. <br /> XIX. SAFETY PROGRAM REQUIREMENTS <br /> Work Site Safety shall be as defined by the Standard Specifications and these special provisions: <br /> City of Santa Ana RFP 25-116 Page 28 of 60 <br />
The URL can be used to link to this page
Your browser does not support the video tag.