Laserfiche WebLink
1 EXHIBIT 1 <br /> CITY OF SANTA ANA <br /> F. Install fixtures and fittings built into or part of each component. Provide access panels for <br /> maintenance of electrical components. <br /> 2.4 Warranty/Guarantee <br /> A. The items specified herein shall be fully and unconditionally guaranteed by the manufacture <br /> against defects in materials,workmanship and installation for the manufactures standard warranty <br /> period after acceptance of installation. <br /> B. All furnishing will be new or gently used, of good material and workmanship, and agrees to replace <br /> promptly any part or parts which by reason of defective material or workmanship shall fail under <br /> normal use, free of negligence accident, for the periods from date of acceptance, as outlined <br /> below: <br /> 1. Structural Frame: Life of system <br /> 2. Fabric: One Year <br /> 3. All other components: Ten Years <br /> C. Such replacement shall be free of any charge to the City. For the purpose of this warranty, normal <br /> use shall be defined as the use in the office, with climatic conditioning equipment. Failure shall <br /> include, but not be limited to, warped, broken, or separated frames, separation of vertical support <br /> standards from frame, disfigurement or enlargement of slots in vertical support standards,warping <br /> and separation of joints in wood products, sagging or warping of work surfaces, failure or <br /> separation of laminate from work surface and trim, separation of edging material from work <br /> surface edge and any other failure which would make the system unsatisfactory for its intended <br /> use. <br /> 3.2 Installation <br /> A. Installation shall be performed by the Contractor or their Subcontractor. <br /> 1. Protect existing building finishes and conditions during installation. Contractor is responsible <br /> to replace or repair any damaged finishes or surfaces due to furniture installation. <br /> 2. Clean surfaces thoroughly prior to installation. Prepare surfaces using the methods <br /> recommended by the manufacture for achieving the best results for the substrate under the <br /> project conditions. <br /> 3. Contractor shall install furniture in locations shown on plans. Contractor shall reposition or <br /> reorient furniture as requested by Project Manager. <br /> 4. Install components and accessories in accordance with manufacturer's instructions. <br /> 5. Scribe to abutting surfaces and align adjoining components. Apply match filler pieces where <br /> components abut dissimilar construction. <br /> 6. Close ends of units, aprons, shelves and bases. <br /> 3.3 Adjustment and Cleaning <br /> A. Remove and replace or repair damaged surfaces or, or defects in, finished products to match <br /> similar undamaged products. <br />