Laserfiche WebLink
The Consultant shall monitor quality on all deliverables, calculations, and other work products. <br />The Consultant shall prepare a Quality Control Plan for all prime and sub -consultant tasks for <br />the project and submit a copy to the City within. thirty (3 4) calendar days of Notice -to- Proceed. <br />This is not a separate task but shall be included as part of Project Administration. The <br />Consultant shall attend meetings as required to complete the Project, including Caltrans Safety <br />Review meeting, Design Review meetings, Constructability Review meetings, Quality <br />meetings, and informational meetings with stakeholders. Provide the deliverables listed in <br />other sections of the scope of work. <br />A. Budgeting <br />The Consultant shall prepare budgets for each task and milestone for the Project. Such <br />budgets shall be entered into the Consultant's Management Information System along with <br />actual costs incurred and used as a basis for cost monitoring and control. <br />B. Cost Accounting <br />Consultant shall prepare monthly reports of expenditures for the Project by task and <br />milestone. Expenditures include direct labor costs, other direct costs and subconsultant <br />costs. These reports shall be included as supporting data for invoices presented to the City <br />every month and shall be in accordance with the City's invoicing requirements. <br />C. Quality Control Plan <br />The PIans, Specifications, and Estimate (PS&E) shall be subject to quality control reviews <br />before submittal. These reviews shall assure conformance to Caltrans and City standards <br />and criteria as well as minimize typographical omissions. Consultant shall submit <br />documentation of the completed QA/QC review. <br />D. Progress Reporting <br />Progress reports shall be prepared in accordance with City and grant guidelines. Reports <br />shall be required monthly and shall accompany the invoice. <br />E. Project Schedule (Critical Path Method Schedule) <br />Within two (2) weeks from the Notice to Proceed (NTP), the Consultant shall provide a <br />detailed schedule of anticipated services to meet the Scope of Work. Provide a schedule <br />using calendar days with a list of tasks and sub -tasks, milestones, major activities and <br />deliverables, including agencies review time (assume 4 weeks for Caltrans review and <br />agency review of each submittal package), submittal and issuance of needed permits. <br />Review of the schedule shall occur at subsequent trend meetings. Adjustments shall be <br />made, as necessary, due to changing circumstances. Plans submitted to the City that are <br />incomplete shall be returned to the Consultant unchecked and the Consultant shall be <br />expected to maintain the Project' delivery schedule at no additional cost to the City. <br />Consultant shall be familiar with Caltrans' plan check submittal procedures and timelines <br />and shall schedule plan check submittals in order to maintain the Project schedule. <br />