Laserfiche WebLink
F. Risk Assessment <br />The Consultant shall identify all material risks and harms to the project and the strategies <br />that the lead agency and any project partners need to undertake or will undertake to mitigate <br />those risks, and describe the potential effects of each risk (if any) on meeting the key project <br />delivery schedule milestones presented in the Proposed Schedule. The Consultant shall <br />assess the greatest risks to the project and identify how the project parties will mitigate <br />those risks. A report detailing identified risks shall be prepared by the Consultant and <br />update throughout the project implementation. <br />2. DATA COLLECTION <br />The Project shall involve the review and assimilation of a large amount of existing data and <br />the generation of new data. The Consultant shall perform all research of agency records, as <br />necessary, to secure the information, clearances, and/or plan review services required to <br />identify, locate, and accurately layout all of the improvements above and underground within <br />City ROW; private properties affected with the Project; SCRRA; County of Orange; and with <br />Caltrans ROW, Consultant shall accurately layout easements, centerline, ROW, addresses and <br />private property lines. <br />Perform research of records including utilities and other agency records as necessary to secure <br />information required to identify, locate, and accurately layout all existing utilities, <br />improvements, easements, and rights -of -way within project limits that may interfere with the <br />proposed improvements. The information to be researched shall be, as a minimum, the <br />following: <br />• Review existing utility and street record drawing plans. <br />• Perform utility investigation/utility coordination and provide utility relocation <br />recommendations. <br />• Perform an existing utility easement investigation (Prior Rights for proposed <br />relocation). <br />• Coordinate with Consultant's Right -of -Way Acquisition subconsultant to perform field <br />investigation and measurement to assess existing site conditions. <br />• Provide a copy of all utility notifications and responses prior to first progress payment <br />request. <br />• Coordination ROW permits <br />The Consultant shall determine the ownership rights (utilities in their own easement or utilities <br />by City franchise agreement) of utilities affected by Project construction and shall coordinate <br />and notify the City if any costs are to be paid by the City for utility relocations early in the <br />design process. The Consultant shall track the progress/schedule of the utility company <br />relocation plan preparation in order to have the utility facility relocated prior to construction <br />(preferred) or to ensure final approved utility relocation plans are attached to the City <br />construction plans including the number of working days required by the Utility to construct <br />their facilities clearly identified in the Special Provisions, A utility matrix shall be prepared <br />listing the facility type, construction material, location./depth and disposition of utilities within <br />the Project limits. <br />