My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2026 2:30:24 PM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Consultant shall perform all research of private development plans adjacent to or affecting <br />the Project site, as necessary, to secure the information, clearances, and/or plan review services <br />required to identify, locate, and accurately layout all of the above underground improvements <br />and easements, centerline, ROW, and private property lines. The selected Consultant shall be <br />expected to determine what data sources are necessary to gather and by what date, and to <br />prioritize the gathering of that data. Consultant shall research and review all previous work <br />performed to date in the Project vicinity that impacts the design of the improvements, including <br />but not limited to: <br />• Existing improvement plans/engineering reports of record <br />• Right-of-way mapping, ownership records (Title Reports) <br />• Preliminary engineering and reports for this Project <br />• Environmental clearance and mitigation measures <br />• City/other agency engineering design standards, codes, and plan processing procedures <br />• Existing topographic mapping, photos, reports, maintenance reports, "as -built" plans, <br />record maps and surveys, study reports, assessor maps, contract documents, utility <br />index maps, local street improvement/development plans and other pertinent data shall <br />be obtained and reviewed. <br />In case of conflict, ambiguities, discrepancies, errors, or omissions among the reference <br />materials obtained by Consultant from other agencies, Consultant shall submit the matter to <br />City for clarification. Any work affected by such conflicts, ambiguities, discrepancies, errors <br />or omissions which is performed by Consultant prior to clarification by City shall be at <br />Consultant's risk and expense. In event that non-standard features become apparent during the <br />initial design, Consultant shall prepare the necessary design exceptions following Caltrans or <br />SCRRA and the respective city's guidelines. <br />The Consultant shall positively locate all, both high- and low -risk (pothole) utilities in <br />conformance with Government Code 4216 to determine the depth and size for clearance and <br />connection points or conflicts for any underground improvements, such as gas lines and <br />services, electrical lines and services, signal, street lighting, communication lines and services, <br />sewer lines and services, storm drains, or potable and non -potable water lines and services. <br />The Consultant shall submit to each utility company a preliminary set of plans that provide the <br />location, elevation of the utility, and the elevation of the improvement, with the conflict area <br />clouded to show the utility companies the areas of conflict with the proposed improvement. <br />Potholing information and plan shall be submitted to the City after completion of this task. If <br />an area of possible conflict was not potholed during the project design phase and the City <br />determines that additional potholing is required, the Consultant shall pothole the area to verify <br />any conflicts at no additional cost to the City. Consultant and Subconsultants shall obtain <br />necessary training including applicable rail safety program prior to performing field <br />investigations. All said training shall be at the sole cost of the Consultant and at no additional <br />cost to the City. <br />The City expects that the selected team shall make the best use of existing data to minimize <br />waste and duplication of work efforts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.