My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARK THOMAS & COMPANY, INC. (6)
Clerk
>
Contracts / Agreements
>
M
>
MARK THOMAS & COMPANY, INC. (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2026 2:30:24 PM
Creation date
5/27/2026 8:21:03 AM
Metadata
Fields
Template:
Contracts
Company Name
MARK THOMAS & COMPANY, INC.
Contract #
A-2026-063
Agency
Public Works
Council Approval Date
5/5/2026
Expiration Date
5/4/2029
Insurance Exp Date
9/15/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />will include, but is not limited to, improvements <br />such hardscape, drainage features, utility facilities, <br />break lines, driveways, and other pertinent <br />features to produce accurate elevations and <br />horizontal locations. <br />Other mapped features will generally include, but <br />are not limited to: edge of pavement, curb and <br />gutter, curb ramps, sidewalks, driveways, parking <br />features, roadway crown, critical flow areas, <br />landscape features such as trees greater than 6" <br />trunk diameter and significant vegetation, <br />manholes, drop inlets, walls, signs, <br />utility/light/signal poles, above ground utility service <br />facilities and underground utility paint mark <br />Figure 1. Aerial Mapping Limits <br />CITY OF SANTA ANA <br />SANTA ANA BOULEVARD GRADE SEPARATION <br />HARK THOHAS <br />locations, storm drain facilities, and other visible <br />improvements at the ground surface elevations. <br />Cross -sections will be performed at maximum of <br />50' intervals where requested and will generally <br />extend approximately 10' back of walk or to right- <br />of-way lines, where accessible. Break lines will be <br />collected along all mapped improvements listed <br />above to create continuous contours with a 1.0' <br />interval and a Digital Terrain Model (DTM). <br />Mark Thomas has will invert/dip and detail up to <br />twenty (20) storm drain manholes, sewer <br />manholes and catch basin features within the <br />project area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.