Laserfiche WebLink
SCOPE OF SERVICES <br />designer and checker will be reconciled for plan <br />updates in the following submittal. <br />8.3 Pedestrian Bridge <br />8.3.1 Type Selection <br />Mark Thomas will prepare a Structure Type <br />Selection Report to assist the City in determining <br />the best suited structure type for the project. The <br />Type Selection Report will discuss geotechnical, <br />hydraulic, seismic, constructability, aesthetic, <br />utility, and drainage issues related to the structure <br />A final proposed alternative will be recommended <br />in the report, which will include a General Plan, <br />Foundation Plan, and General Plan Estimate for <br />the recommended alternative. <br />8.3.2 Plan Preparation <br />Mark Thomas will prepare structural calculations <br />and plans for the recommended bridge alternative. <br />For the purposes of this scope of work, it is <br />assumed that a two -span, cast -in -place, post - <br />tensioned box girder is the preferred structure <br />alternative. The structure design will be in <br />accordance with AASHTO LRFD Guide <br />Specification for the Design of Pedestrian Bridges, <br />2nd Edition with the California Amendments and <br />Caltrans Seismic Design Criteria, Version 2.1. The <br />2025 Caltrans Standards and current versions of <br />the Caltrans Structure Technical Policies and <br />Bridge Design Manuals will be used. It is assumed <br />that the following plan sheets will be prepared: <br />• General Plan (1) <br />• Index to Plans (1) <br />• Deck Contours (1) <br />• Foundation Plan (1) <br />• Abutment Layout (2) <br />• Abutment Details (3) <br />• Bent Layout (1) <br />• Bent Details (3) <br />• Typical Section (1) <br />• Girder Layout (1) <br />• Girder Details (2) <br />• Railing Details (1) <br />• Joint Details (1) <br />• Miscellaneous Details (1) <br />• Log of Test Borings (3) <br />• Total Sheets: 23 <br />CITY OF SANTA ANA „ <br />SANTA ANA BOULEVARD GRADE SEPARATION <br />HARKTHOHAS <br />8.3.3 Independent Check <br />Mark Thomas will perform an independent design <br />check of the pedestrian bridge in conformance with <br />Caltrans bridge design procedures. The <br />independent check will be completed by an <br />engineer who was not involved in the original <br />design of the structure. Calculations will be <br />performed to check the bridge layouts and <br />structural integrity. Upon completion of the <br />independent check, discrepancies between the <br />designer and checker will be reconciled and plans <br />updated. <br />8.4 Retaining Walls <br />8.4.1 Plan Preparation <br />Mark Thomas will prepare structural calculations <br />and plans for the retaining walls, including <br />staircase details between retaining walls adjacent <br />to northwest corner of the Pedestrian <br />Overcrossing, with the proposed wall type for each <br />location. For the purposes of this scope of work, it <br />is assumed that combination of soldier pile walls <br />andfor secant pile walls (top down construction <br />method) and a Cast -In -Place (CIP) gravity <br />cantilever concrete retaining walls (bottom up <br />construction method) will be utilized for the 6 wall <br />locations. <br />The structure design will be in accordance with <br />AASHTO LRFD Bridge Design Specifications, 8th <br />Edition with the California Amendments and <br />SCRRA standards and design manuals. The 2025 <br />Caltrans Standards and current versions of the <br />Caltrans Structure Technical Policies and Bridge <br />Design Manuals will be used. It is assumed that <br />the following plan sheets will be prepared: <br />Retaining Walls Sheet Description <br />• General Plan (1) <br />• Index to Plans (1) <br />• General Notes (1) <br />• Construction Details (1) <br />• Structure Plan (9) <br />• Wall Details (8) <br />• Drainage Layout (2) <br />• Drainage Details (2) <br />• Railing Details (2) <br />• Aesthetic Details (1) <br />• Miscellaneous Details (2) <br />