SCOPE OF SERVICES <br />related to full closures and potential impacts to 1-5 <br />ramps. This scope of work assumes that a brief <br />technical memorandum will provide enough <br />evidence that traffic volumes at Santa Ana <br />Boulevard and adjacent 1-5 interchanges are not <br />high enough to warrant a full detour assessment. <br />Task Deliverables: <br />Draft and Final TMP <br />Task 12 Agreements & Permits <br />The necessary third party permits for the design <br />and construction will be obtained. <br />12.1 CPUC GO 88-B <br />12.2 SCRRA Rights of Entry <br />12.3 Caltrans Encroachment Permit <br />12.4 C&M Agreement Support <br />Task Deliverables: <br />• Draft and Final GO 88-B <br />• SCRRA Right of Entry (DES) <br />• SCRRA Right of Entry (CON) <br />• Caltrans Encroachment Permit (DES) <br />• Caltrans Encroachment Permit (CON) <br />• C&M Agreement Supporting Documents <br />Task 13 Bid & Construction Support <br />Support will continue through the bid and <br />construction phases of the project. <br />13.1 Bid Support <br />13.2 Conformed Documents <br />13.3 Construction Support <br />Task Deliverables: <br />• Response to Contractor RFIs <br />• Contract Bid Review <br />• Review of Shop Drawings & Submittals <br />• Construction Change Request Review <br />• Additional Drawings/Exhibits <br />• As -Built Documents <br />CITY OF SANTA ANA <br />SANTA ANA BOULEVARD GRADE SEPARATION ■ <br />NARK THOMAS <br />Task 14 Optional Tasks <br />Additional services may be provided under this <br />task on an as -needed basis. <br />14.1 Construction Staking <br />Mark Thomas will provide one set of construction <br />stakes or offset staking as directed by the <br />Contractor or the City of Santa Ana. Construction <br />staking services will be performed in accordance <br />with the work as outlined in Chapter 12 of the <br />Caltrans Surveys Manual; Construction Surveys <br />and will consist of construction survey services, <br />including field surveys and the necessary office <br />support to coordinate staking requirements with <br />the Resident Engineer. <br />Mark Thomas will coordinate field staking with the <br />Contactor and/or the City of Santa Ana. Field <br />staking will begin two working days after receipt of <br />staking request, assuming all clarifications and the <br />area is ready for staking. Mark Thomas will <br />prepare and maintain a spreadsheet tracking all <br />written staking requests, dates of requests, dates <br />of staking and all notes (cut sheets) regarding the <br />staking. <br />Assumptions <br />• Restaking due to lost or destroyed stakes <br />will be performed as approved by the <br />Contactor and will be compensated as <br />extra work. <br />• For the purposes of this proposal, one crew <br />mobilization shall be defined as one day of <br />continuous, uninterrupted staking effort to <br />complete a staking priority. <br />• After a survey request is received and if the <br />survey field crews are mobilized to an area <br />that is not ready for stakes, the Contractor <br />will be charged a minimum of 4 hours of <br />field crew time as an extra above the <br />contracted amount. <br />• Mark Thomas will receive a 3-week look - <br />ahead schedule of operations and time <br />estimates and discuss staking <br />need sloperations with Contractor <br />• It is assumed stakes will be used within <br />three working days of being set in order to <br />preserve the integrity of the staking. <br />