My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25B - SANTA ANA BLVD GRADE SEPARATION_Exhibit A-1_Color
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2011
>
01/18/2011
>
25B - SANTA ANA BLVD GRADE SEPARATION_Exhibit A-1_Color
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 2:44:35 PM
Creation date
1/3/2011 11:41:16 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
25G
Date
1/4/2011
Destruction Year
2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
■ AECOM <br />Robert Price, PE <br />Retaining Walls <br />Education and Registrations <br />BS /1992 /Civil Engineering <br />Coursework, Reinforced and Prestressed <br />Concrete Design, Arizona State University <br />PE /1995 /Arizona No: 29684 (Civil) <br />PE /1997 /California No: 56855 (Civil) <br />in <br />M = <br />Mr. Price has extensive experience in the bridge field including over 14 years in the <br />design of steel girder, post - tensioned and reinforced concrete box girder, precast - <br />prestressed concrete I girder, and segmental box girder bridges for highways and <br />railroads from conceptual to final design. He is also experienced in the design of <br />special steel erection equipment and precast concrete segmental viaducts; travel- <br />ing maintenance scaffolding for major bridges; and seismic retrofit and repair of <br />steel plate girder, truss, and concrete bridges. He has been a project engineer on <br />highway bridge replacement and rehabilitation (HBRR) projects in California and is <br />familiar with Caltrans local programs procedures. He has supervised preparation <br />of construction documents and prepared engineering estimates and specifications <br />for roadway and bridge projects in Arizona, Nevada, California, and international <br />projects. He also has designed major arterial street projects for large metropolitan <br />cities, and is experienced in many design -build projects. <br />Hageman Road Grade Separation Project, Kern County, California Senior Bridge <br />Engineer for the independent design check for two underpass structures. <br />Cameron Park Drive /Palmer Drive /Country Club Drive Interim Improvements, <br />Cameron Park, California: Project Manager for interim safety improvements for <br />two intersections in close proximity. The safety improvements included adding <br />lanes, right turn pockets, re- stripping and signals. Plans included drainage <br />improvements and retaining walls. <br />The Old Road Bridge at Castaic Creek (Replace) & Tieback Wall at Honor Ranch <br />Road Overcrossing, County of Los Angeles, California: Engineer of record, <br />responsible for the design review and PS &E of the bridge. The widening of The <br />Old Road at Honor Ranch Road Overcrossing required a tieback wall of 13.5 feet in <br />height. Plans included separate plans for the Tieback Wall. <br />Cameron Park Drive /Palmer Drive /Country Club Drive Interim Improvements, <br />Cameron Park, California: Project Manager for interim safety improvements for <br />two intersections in close proximity. The safety improvements included adding <br />lanes, right turn pockets, re- stripping and signals. Plans included drainage <br />improvements and retaining walls. The environmental documentation included a <br />mitigated negative declaration prepared by PMC, our sub. <br />The Old Road Bridge at Castaic Creek (Replace) & Tieback Wall at Honor Ranch <br />Road Overcrossing, County of Los Angeles, California: Engineer of record, <br />responsible for the design review and PS &E of the 3 span, 250 foot long, 4' -3" <br />deep, 76' -9" wide post- tensioned cast -in -place concrete box girder bridge. The <br />bridge plans are staged with the construction of the western section while the <br />existing bridge remains in service. The pier walls line up with the neighboring <br />twin 1 -5 bridges to maximize hydraulic capacity of the creek. The footings are <br />below scour depth and use steel H- piles. Approaches include a type 5 (L shaped) <br />retaining walls at the 1 -5 right -of -way. The widening of The Old Road at Honor <br />Ranch Road Overcrossing required a tieback wall of 13.5 feet in height. Plans <br />included separate plans for the Tieback Wall. <br />1 -80 Nut Tree Road OC (Widen), Vacaville, California Engineer of record, <br />responsible for the design of a bridge widening, and a specially designed <br />retaining wall (mechanically stabilized earth) for this project. The submittal for <br />the Structure Type Selection and Seismic Analysis for the 99.518 meter long four <br />span cast -in- place, prestressed concrete box girder Nut Tree Road OC received <br />approval from Caltrans since it passes over 1 -80. The bridge was widened on <br />both sides from 12.313 meters of existing width to 31.355 meters in width. As <br />part of our type selection submittal, prepared the General Plan and Estimate <br />for two different widening alternatives to meet the restricted vertical clearance <br />associated with the existing structure. Alternatives considered both an 11 00m <br />II� <br />e 4tl 000 <br />®® <br />Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Boulevard Grade Separation Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.