Laserfiche WebLink
■ AECOM 14 0 <br />Calvin Yoshitake, <br />Mr. Yoshitake has over 35 years of experience in surveying and engineering, includ- <br />ing a 13 year career with the A.T. & S.F. Railway Company (currently BNSFF). Mr. <br />PLS, RLS <br />Yoshitake has managed both field and office operations for all phases of surveying <br />Survey Services <br />and mapping services. His experience spans projects for 30 transit centers and <br />114 bridges /grade separations. He has also played a major surveying role on 5 <br />Education and Registrations <br />large design -build projects and 20 railroad yards, including 7 intermodal container <br />Major course work /1988 /Boundary <br />transfer facilities. Mr. Yoshitake is well - versed in the specifications and protocol <br />Control <br />for CalTrans, CPUC and railroad companies. He has performed Right -of -Way sur- <br />BS /1973 /Forestry <br />veys, design surveys and construction staking for 1,000 projects /tasks for public <br />Major course work /1971 /Engineering <br />agencies, engineers, contractors, architects, railroads, utilities, private developers <br />PLS /California No: 5822 <br />and owners. <br />RLS /Arizona, No: 24538 <br />San Gabriel Trench Phase 1 and 2, Alameda Corridor East Authority. Survey <br />Project Manager - San Gabriel Trench Phase 1 and 2 (2.2 miles & 4 grade <br />separations) Reference: Duane Kenagy, PE, Sr. VP, Moffatt & Nichol (562) 423- <br />9551, Nogales Grade Separation (UPRR LA Subdivision), Nogales Grade Separation <br />(UPRR Alhambra Subdivision) and the Brea Canyon Grade Separation. . <br />Alameda Mid - Corridor Design Build Project, Alameda Corridor Transportation <br />Authority Survey Project Manager. (10 miles & 32 grade separations). The Mid - <br />Corridor segment is a railroad corridor trench that is 33 feet deep, 40 feet wide, <br />and 50 feet wide, running between the Artesia (91) Freeway in Compton to the <br />Santa Monica (10) Freeway in Los Angeles. 32 railroad grade separations were <br />built over the trench. Mr. Yoshitake managed the combined efforts of 3 survey <br />companies and an aerial mapping company. <br />Pasadena Gold Line Design -Build Project, LA MTA. Survey Project Manager - (14 <br />miles, 13 RR stations, 2 RR boxes and RR yard). Exposition Line Design -Build <br />Project (8 miles, 9 RR stations, 3 grade separations, RR river bridge & RR box). <br />Bus Rapid Transit Orange Line Design -Build Project (13 miles) and the Chinatown <br />Aerial Design -Build Project (3,000 foot long aerial bridge). <br />II� <br />e 4tl 000 <br />®® <br />Proposal for Project Study Report Equivalent and Conceptual Engineering Plans for <br />Santa Ana Boulevard Grade Separation Project <br />